Abfragezeit: 0.29 ms Abfragespeichernutzung: 0.025 MB Speichernutzung vor Abfrage: 0.751 MB Zeilen zurückgegeben: 1
SELECT `data`
FROM `adqlu_session`
WHERE `session_id` = 'r3ftnmqsu0jpqod78f6ujvln8m'
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | adqlu_session | const | PRIMARY | PRIMARY | 766 | const | 1 | |
| Status | Duration |
|---|
| Starting | 0.02 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.01 ms |
| Checking query cache for query | 0.02 ms |
| Checking permissions | 0.00 ms |
| Opening tables | 0.02 ms |
| After opening tables | 0.01 ms |
| System lock | 0.01 ms |
| Table lock | 0.01 ms |
| Waiting for query cache lock | 0.01 ms |
| Init | 0.01 ms |
| Optimizing | 0.01 ms |
| Statistics | 0.03 ms |
| Preparing | 0.01 ms |
| Unlocking tables | 0.01 ms |
| Preparing | 0.01 ms |
| Executing | 0.01 ms |
| Sending data | 0.01 ms |
| End of update loop | 0.00 ms |
| Query end | 0.01 ms |
| Commit | 0.01 ms |
| Closing tables | 0.01 ms |
| Unlocking tables | 0.00 ms |
| Closing tables | 0.01 ms |
| Starting cleanup | 0.01 ms |
| Freeing items | 0.01 ms |
| Updating status | 0.00 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.00 ms |
| Storing result in query cache | 0.01 ms |
| Reset for next command | 0.00 ms |
| # | Aufrufer | Datei und Zeilennummer | | 14 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1728 |
| 13 | JDatabaseDriver->loadResult() | JROOT/libraries/joomla/session/storage/database.php:44 |
| 12 | JSessionStorageDatabase->read() | Der selbe Aufruf in der Zeile darunter. |
| 11 | session_start() | JROOT/libraries/joomla/session/handler/native.php:259 |
| 10 | JSessionHandlerNative->doSessionStart() | JROOT/libraries/joomla/session/handler/native.php:49 |
| 9 | JSessionHandlerNative->start() | JROOT/libraries/joomla/session/handler/joomla.php:81 |
| 8 | JSessionHandlerJoomla->start() | JROOT/libraries/joomla/session/session.php:636 |
| 7 | JSession->_start() | JROOT/libraries/joomla/session/session.php:596 |
| 6 | JSession->start() | JROOT/libraries/cms/application/cms.php:773 |
| 5 | JApplicationCms->loadSession() | JROOT/libraries/cms/application/cms.php:131 |
| 4 | JApplicationCms->__construct() | JROOT/libraries/cms/application/site.php:63 |
| 3 | JApplicationSite->__construct() | JROOT/libraries/cms/application/cms.php:408 |
| 2 | JApplicationCms::getInstance() | JROOT/libraries/joomla/factory.php:125 |
| 1 | JFactory::getApplication() | JROOT/index.php:46 |
Abfragezeit: 0.17 ms Nach letzter Abfrage: 0.57 ms Abfragespeichernutzung: 0.003 MB Speichernutzung vor Abfrage: 0.769 MB
DELETE
FROM `adqlu_session`
WHERE `time` < '1788499419'
„EXPLAIN“ unmöglich für Abfrage: DELETE
FROM `adqlu_session`
WHERE `time` < '1788499419'
| Status | Duration |
|---|
| Starting | 0.02 ms |
| Checking permissions | 0.01 ms |
| Opening tables | 0.01 ms |
| After opening tables | 0.01 ms |
| System lock | 0.00 ms |
| Table lock | 0.01 ms |
| Init for update | 0.03 ms |
| Updating | 0.02 ms |
| End of update loop | 0.01 ms |
| Query end | 0.01 ms |
| Commit | 0.01 ms |
| Closing tables | 0.00 ms |
| Unlocking tables | 0.00 ms |
| Closing tables | 0.01 ms |
| Starting cleanup | 0.00 ms |
| Freeing items | 0.00 ms |
| Updating status | 0.01 ms |
| Reset for next command | 0.00 ms |
| # | Aufrufer | Datei und Zeilennummer | | 6 | JDatabaseDriverMysqli->execute() | JROOT/libraries/cms/application/cms.php:790 |
| 5 | JApplicationCms->loadSession() | JROOT/libraries/cms/application/cms.php:131 |
| 4 | JApplicationCms->__construct() | JROOT/libraries/cms/application/site.php:63 |
| 3 | JApplicationSite->__construct() | JROOT/libraries/cms/application/cms.php:408 |
| 2 | JApplicationCms::getInstance() | JROOT/libraries/joomla/factory.php:125 |
| 1 | JFactory::getApplication() | JROOT/index.php:46 |
Abfragezeit: 0.47 ms Nach letzter Abfrage: 0.98 ms Abfragespeichernutzung: 0.061 MB Speichernutzung vor Abfrage: 0.798 MB Zeilen zurückgegeben: 47
SELECT `extension_id` AS `id`,`element` AS `option`,`params`,`enabled`
FROM `adqlu_extensions`
WHERE `type` = 'component'
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | adqlu_extensions | ref | extension | extension | 82 | const | 47 | Using index condition |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.01 ms |
| Checking query cache for query | 0.02 ms |
| Checking permissions | 0.01 ms |
| Opening tables | 0.01 ms |
| After opening tables | 0.01 ms |
| System lock | 0.01 ms |
| Table lock | 0.01 ms |
| Waiting for query cache lock | 0.01 ms |
| Init | 0.01 ms |
| Optimizing | 0.01 ms |
| Statistics | 0.03 ms |
| Preparing | 0.01 ms |
| Executing | 0.01 ms |
| Sending data | 0.09 ms |
| Waiting for query cache lock | 0.01 ms |
| Sending data | 0.14 ms |
| End of update loop | 0.01 ms |
| Query end | 0.00 ms |
| Commit | 0.00 ms |
| Closing tables | 0.01 ms |
| Unlocking tables | 0.00 ms |
| Closing tables | 0.01 ms |
| Starting cleanup | 0.00 ms |
| Freeing items | 0.01 ms |
| Updating status | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.00 ms |
| Storing result in query cache | 0.01 ms |
| Reset for next command | 0.00 ms |
| # | Aufrufer | Datei und Zeilennummer | | 9 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1689 |
| 8 | JDatabaseDriver->loadObjectList() | JROOT/libraries/joomla/cache/controller/callback.php:152 |
| 7 | JCacheControllerCallback->get() | JROOT/libraries/cms/component/helper.php:448 |
| 6 | JComponentHelper::load() | JROOT/libraries/cms/component/helper.php:43 |
| 5 | JComponentHelper::getComponent() | JROOT/libraries/cms/component/helper.php:120 |
| 4 | JComponentHelper::getParams() | JROOT/libraries/cms/application/site.php:589 |
| 3 | JApplicationSite->initialiseApp() | JROOT/libraries/cms/application/site.php:209 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 0.06 ms Nach letzter Abfrage: 1.23 ms Abfragespeichernutzung: 0.022 MB Speichernutzung vor Abfrage: 0.872 MB Zeilen zurückgegeben: 1
SELECT b.id
FROM adqlu_usergroups AS a
LEFT JOIN adqlu_usergroups AS b
ON b.lft <= a.lft
AND b.rgt >= a.rgt
WHERE a.id = 1
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | a | const | PRIMARY | PRIMARY | 4 | const | 1 | |
| 1 | SIMPLE | b | range | idx_usergroup_nested_set_lookup | idx_usergroup_nested_set_lookup | 4 | NULL | 1 | Using where; Using index |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.01 ms |
| Checking privileges on cached | 0.00 ms |
| Checking permissions | 0.01 ms |
| Sending cached result to clien | 0.01 ms |
| Updating status | 0.01 ms |
| Reset for next command | 0.00 ms |
| # | Aufrufer | Datei und Zeilennummer | | 11 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1538 |
| 10 | JDatabaseDriver->loadColumn() | JROOT/libraries/joomla/access/access.php:835 |
| 9 | JAccess::getGroupsByUser() | JROOT/libraries/joomla/access/access.php:904 |
| 8 | JAccess::getAuthorisedViewLevels() | JROOT/libraries/joomla/user/user.php:454 |
| 7 | JUser->getAuthorisedViewLevels() | JROOT/libraries/cms/plugin/helper.php:296 |
| 6 | JPluginHelper::load() | JROOT/libraries/cms/plugin/helper.php:86 |
| 5 | JPluginHelper::getPlugin() | JROOT/libraries/cms/plugin/helper.php:128 |
| 4 | JPluginHelper::isEnabled() | JROOT/libraries/cms/application/site.php:599 |
| 3 | JApplicationSite->initialiseApp() | JROOT/libraries/cms/application/site.php:209 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 0.06 ms Nach letzter Abfrage: 0.22 ms Abfragespeichernutzung: 0.023 MB Speichernutzung vor Abfrage: 0.878 MB Zeilen zurückgegeben: 5
SELECT id, rules
FROM `adqlu_viewlevels`
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | adqlu_viewlevels | ALL | NULL | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 5 | |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.01 ms |
| Checking privileges on cached | 0.00 ms |
| Checking permissions | 0.01 ms |
| Sending cached result to clien | 0.01 ms |
| Updating status | 0.01 ms |
| Reset for next command | 0.00 ms |
| # | Aufrufer | Datei und Zeilennummer | | 10 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1494 |
| 9 | JDatabaseDriver->loadAssocList() | JROOT/libraries/joomla/access/access.php:921 |
| 8 | JAccess::getAuthorisedViewLevels() | JROOT/libraries/joomla/user/user.php:454 |
| 7 | JUser->getAuthorisedViewLevels() | JROOT/libraries/cms/plugin/helper.php:296 |
| 6 | JPluginHelper::load() | JROOT/libraries/cms/plugin/helper.php:86 |
| 5 | JPluginHelper::getPlugin() | JROOT/libraries/cms/plugin/helper.php:128 |
| 4 | JPluginHelper::isEnabled() | JROOT/libraries/cms/application/site.php:599 |
| 3 | JApplicationSite->initialiseApp() | JROOT/libraries/cms/application/site.php:209 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 0.90 ms Nach letzter Abfrage: 0.07 ms Abfragespeichernutzung: 0.043 MB Speichernutzung vor Abfrage: 0.886 MB Zeilen zurückgegeben: 76
SELECT folder AS type, element AS name, params
FROM adqlu_extensions
WHERE enabled = 1
AND type ='plugin'
AND state IN (0,1)
AND access IN (1,1)
ORDER BY ordering
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | adqlu_extensions | ref | extension | extension | 82 | const | 114 | Using index condition; Using where; filesort wurde genutzt |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.03 ms |
| Checking permissions | 0.01 ms |
| Opening tables | 0.01 ms |
| After opening tables | 0.01 ms |
| System lock | 0.01 ms |
| Table lock | 0.00 ms |
| Waiting for query cache lock | 0.01 ms |
| Init | 0.02 ms |
| Optimizing | 0.02 ms |
| Statistics | 0.03 ms |
| Preparing | 0.02 ms |
| Sorting result | 0.01 ms |
| Executing | 0.00 ms |
| Sending data | 0.01 ms |
| Creating sort index | 0.50 ms |
| Waiting for query cache lock | 0.01 ms |
| Creating sort index | 0.10 ms |
| End of update loop | 0.01 ms |
| Query end | 0.01 ms |
| Commit | 0.00 ms |
| Closing tables | 0.00 ms |
| Unlocking tables | 0.00 ms |
| Closing tables | 0.01 ms |
| Starting cleanup | 0.00 ms |
| Freeing items | 0.01 ms |
| Updating status | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.01 ms |
| Waiting for query cache lock | 0.01 ms |
| Updating status | 0.00 ms |
| Storing result in query cache | 0.00 ms |
| Reset for next command | 0.01 ms |
| # | Aufrufer | Datei und Zeilennummer | | 8 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1689 |
| 7 | JDatabaseDriver->loadObjectList() | JROOT/libraries/cms/plugin/helper.php:310 |
| 6 | JPluginHelper::load() | JROOT/libraries/cms/plugin/helper.php:86 |
| 5 | JPluginHelper::getPlugin() | JROOT/libraries/cms/plugin/helper.php:128 |
| 4 | JPluginHelper::isEnabled() | JROOT/libraries/cms/application/site.php:599 |
| 3 | JApplicationSite->initialiseApp() | JROOT/libraries/cms/application/site.php:209 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 3.08 ms Nach letzter Abfrage: 8.19 ms Abfragespeichernutzung: 0.602 MB Speichernutzung vor Abfrage: 1.536 MB Zeilen zurückgegeben: 345
SELECT m.id, m.menutype, m.title, m.alias, m.note, m.path AS route, m.link, m.type, m.level, m.language,`m`.`browserNav`, m.access, m.params, m.home, m.img, m.template_style_id, m.component_id, m.parent_id,e.element as component
FROM adqlu_menu AS m
LEFT JOIN adqlu_extensions AS e
ON m.component_id = e.extension_id
WHERE m.published = 1
AND m.parent_id > 0
AND m.client_id = 0
ORDER BY m.lft
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | m | ref | idx_client_id_parent_id_alias_language | idx_client_id_parent_id_alias_language | 1 | const | 480 | Using index condition; Using where; filesort wurde genutzt |
| 1 | SIMPLE | e | eq_ref | PRIMARY | PRIMARY | 4 | staging_otterbein.m.component_id | 1 | Using where |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.05 ms |
| Checking permissions | 0.00 ms |
| Opening tables | 0.01 ms |
| After opening tables | 0.00 ms |
| System lock | 0.00 ms |
| Table lock | 0.00 ms |
| Waiting for query cache lock | 0.01 ms |
| Init | 0.02 ms |
| Optimizing | 0.02 ms |
| Statistics | 0.03 ms |
| Preparing | 0.02 ms |
| Sorting result | 0.01 ms |
| Executing | 0.00 ms |
| Sending data | 0.01 ms |
| Creating sort index | 1.09 ms |
| Waiting for query cache lock | 0.01 ms |
| Creating sort index | 0.06 ms |
| Waiting for query cache lock | 0.00 ms |
| Creating sort index | 0.08 ms |
| Waiting for query cache lock | 0.00 ms |
| Creating sort index | 0.07 ms |
| Waiting for query cache lock | 0.00 ms |
| Creating sort index | 0.06 ms |
| Waiting for query cache lock | 0.00 ms |
| Creating sort index | 0.05 ms |
| Waiting for query cache lock | 0.00 ms |
| Creating sort index | 0.07 ms |
| Waiting for query cache lock | 0.00 ms |
| Creating sort index | 0.06 ms |
| Waiting for query cache lock | 0.00 ms |
| Creating sort index | 0.06 ms |
| Waiting for query cache lock | 0.00 ms |
| Creating sort index | 0.06 ms |
| Waiting for query cache lock | 0.00 ms |
| Creating sort index | 0.07 ms |
| Waiting for query cache lock | 0.00 ms |
| Creating sort index | 0.06 ms |
| Waiting for query cache lock | 0.00 ms |
| Creating sort index | 0.06 ms |
| Waiting for query cache lock | 0.00 ms |
| Creating sort index | 0.05 ms |
| Waiting for query cache lock | 0.00 ms |
| Creating sort index | 0.06 ms |
| Waiting for query cache lock | 0.00 ms |
| Creating sort index | 0.06 ms |
| Waiting for query cache lock | 0.00 ms |
| Creating sort index | 0.06 ms |
| Waiting for query cache lock | 0.00 ms |
| Creating sort index | 0.06 ms |
| Waiting for query cache lock | 0.00 ms |
| Creating sort index | 0.08 ms |
| Waiting for query cache lock | 0.00 ms |
| Creating sort index | 0.07 ms |
| Waiting for query cache lock | 0.00 ms |
| Creating sort index | 0.05 ms |
| Waiting for query cache lock | 0.00 ms |
| Creating sort index | 0.05 ms |
| Waiting for query cache lock | 0.00 ms |
| Creating sort index | 0.05 ms |
| Waiting for query cache lock | 0.00 ms |
| Creating sort index | 0.05 ms |
| Waiting for query cache lock | 0.00 ms |
| Creating sort index | 0.06 ms |
| Waiting for query cache lock | 0.00 ms |
| Creating sort index | 0.05 ms |
| Waiting for query cache lock | 0.00 ms |
| Creating sort index | 0.05 ms |
| Waiting for query cache lock | 0.00 ms |
| Creating sort index | 0.05 ms |
| End of update loop | 0.00 ms |
| Query end | 0.00 ms |
| Commit | 0.00 ms |
| Closing tables | 0.00 ms |
| Unlocking tables | 0.00 ms |
| Closing tables | 0.01 ms |
| Starting cleanup | 0.00 ms |
| Freeing items | 0.01 ms |
| Updating status | 0.00 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.03 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.00 ms |
| Storing result in query cache | 0.00 ms |
| Reset for next command | 0.00 ms |
| # | Aufrufer | Datei und Zeilennummer | | 20 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1689 |
| 19 | JDatabaseDriver->loadObjectList() | JROOT/libraries/cms/menu/site.php:86 |
| 18 | JMenuSite->load() | JROOT/libraries/cms/menu/menu.php:74 |
| 17 | JMenu->__construct() | JROOT/libraries/cms/menu/site.php:57 |
| 16 | JMenuSite->__construct() | JROOT/libraries/cms/menu/menu.php:145 |
| 15 | JMenu::getInstance() | JROOT/libraries/cms/application/cms.php:439 |
| 14 | JApplicationCms->getMenu() | JROOT/libraries/cms/application/site.php:272 |
| 13 | JApplicationSite->getMenu() | JROOT/libraries/cms/application/site.php:438 |
| 12 | JApplicationSite->getTemplate() | JROOT/plugins/system/hg_assets/shortcodes/shortcodes.php:847 |
| 11 | require_once JROOT/plugins/system/hg_assets/shortcodes/shortcodes.php | JROOT/libraries/zauan/shortcodes/shortcodes.php:290 |
| 10 | include_once JROOT/libraries/zauan/shortcodes/shortcodes.php | JROOT/libraries/loader.php:219 |
| 9 | JLoader::import() | JROOT/libraries/loader.php:682 |
| 8 | jimport() | JROOT/plugins/system/hg_assets/hg_assets.php:16 |
| 7 | require_once JROOT/plugins/system/hg_assets/hg_assets.php | JROOT/libraries/cms/plugin/helper.php:230 |
| 6 | JPluginHelper::import() | JROOT/libraries/cms/plugin/helper.php:170 |
| 5 | JPluginHelper::importPlugin() | JROOT/libraries/cms/application/cms.php:669 |
| 4 | JApplicationCms->initialiseApp() | JROOT/libraries/cms/application/site.php:681 |
| 3 | JApplicationSite->initialiseApp() | JROOT/libraries/cms/application/site.php:209 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 0.32 ms Nach letzter Abfrage: 5.38 ms Abfragespeichernutzung: 0.026 MB Speichernutzung vor Abfrage: 4.988 MB Zeilen zurückgegeben: 6
SELECT id, home, template, s.params
FROM adqlu_template_styles as s
LEFT JOIN adqlu_extensions as e
ON e.element=s.template
AND e.type='template'
AND e.client_id=s.client_id
WHERE s.client_id = 0
AND e.enabled = 1
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | s | ALL | idx_template | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 9 | Using where |
| 1 | SIMPLE | e | ref | element_clientid,element_folder_clientid,extension | element_clientid | 403 | staging_otterbein.s.template,const | 1 | Using index condition; Using where |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.03 ms |
| Checking permissions | 0.00 ms |
| Opening tables | 0.01 ms |
| After opening tables | 0.00 ms |
| System lock | 0.00 ms |
| Table lock | 0.00 ms |
| Waiting for query cache lock | 0.01 ms |
| Init | 0.01 ms |
| Optimizing | 0.01 ms |
| Statistics | 0.03 ms |
| Preparing | 0.02 ms |
| Executing | 0.00 ms |
| Sending data | 0.06 ms |
| End of update loop | 0.00 ms |
| Query end | 0.00 ms |
| Commit | 0.00 ms |
| Closing tables | 0.00 ms |
| Unlocking tables | 0.00 ms |
| Closing tables | 0.01 ms |
| Starting cleanup | 0.00 ms |
| Freeing items | 0.01 ms |
| Updating status | 0.00 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.00 ms |
| Storing result in query cache | 0.02 ms |
| Reset for next command | 0.00 ms |
| # | Aufrufer | Datei und Zeilennummer | | 14 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1689 |
| 13 | JDatabaseDriver->loadObjectList() | JROOT/libraries/cms/application/site.php:484 |
| 12 | JApplicationSite->getTemplate() | JROOT/plugins/system/hg_assets/shortcodes/shortcodes.php:847 |
| 11 | require_once JROOT/plugins/system/hg_assets/shortcodes/shortcodes.php | JROOT/libraries/zauan/shortcodes/shortcodes.php:290 |
| 10 | include_once JROOT/libraries/zauan/shortcodes/shortcodes.php | JROOT/libraries/loader.php:219 |
| 9 | JLoader::import() | JROOT/libraries/loader.php:682 |
| 8 | jimport() | JROOT/plugins/system/hg_assets/hg_assets.php:16 |
| 7 | require_once JROOT/plugins/system/hg_assets/hg_assets.php | JROOT/libraries/cms/plugin/helper.php:230 |
| 6 | JPluginHelper::import() | JROOT/libraries/cms/plugin/helper.php:170 |
| 5 | JPluginHelper::importPlugin() | JROOT/libraries/cms/application/cms.php:669 |
| 4 | JApplicationCms->initialiseApp() | JROOT/libraries/cms/application/site.php:681 |
| 3 | JApplicationSite->initialiseApp() | JROOT/libraries/cms/application/site.php:209 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 0.28 ms Nach letzter Abfrage: 4.57 ms Abfragespeichernutzung: 0.026 MB Speichernutzung vor Abfrage: 5.253 MB Zeilen zurückgegeben: 1
SELECT `extension_id` AS `id`,`element` AS `option`,`params`,`enabled`
FROM `adqlu_extensions`
WHERE `type` = 'library'
AND `element` = 'joomla'
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | adqlu_extensions | ref | element_clientid,element_folder_clientid,extension | extension | 484 | const,const | 1 | Using index condition |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.02 ms |
| Checking permissions | 0.00 ms |
| Opening tables | 0.01 ms |
| After opening tables | 0.00 ms |
| System lock | 0.00 ms |
| Table lock | 0.00 ms |
| Waiting for query cache lock | 0.01 ms |
| Init | 0.01 ms |
| Optimizing | 0.01 ms |
| Statistics | 0.03 ms |
| Preparing | 0.01 ms |
| Executing | 0.00 ms |
| Sending data | 0.03 ms |
| End of update loop | 0.00 ms |
| Query end | 0.02 ms |
| Commit | 0.00 ms |
| Closing tables | 0.00 ms |
| Unlocking tables | 0.00 ms |
| Closing tables | 0.01 ms |
| Starting cleanup | 0.00 ms |
| Freeing items | 0.00 ms |
| Updating status | 0.00 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.00 ms |
| Storing result in query cache | 0.00 ms |
| Reset for next command | 0.00 ms |
| # | Aufrufer | Datei und Zeilennummer | | 17 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1650 |
| 16 | JDatabaseDriver->loadObject() | JROOT/libraries/joomla/cache/controller/callback.php:152 |
| 15 | JCacheControllerCallback->get() | JROOT/libraries/cms/library/helper.php:156 |
| 14 | JLibraryHelper::_load() | JROOT/libraries/cms/library/helper.php:47 |
| 13 | JLibraryHelper::getLibrary() | JROOT/libraries/cms/library/helper.php:90 |
| 12 | JLibraryHelper::getParams() | JROOT/libraries/cms/version/version.php:274 |
| 11 | JVersion->getMediaVersion() | JROOT/libraries/joomla/factory.php:755 |
| 10 | JFactory::createDocument() | JROOT/libraries/joomla/factory.php:216 |
| 9 | JFactory::getDocument() | JROOT/plugins/system/gdpr/gdpr.php:1026 |
| 8 | plgSystemGdpr->onAfterRoute() | JROOT/libraries/joomla/event/event.php:69 |
| 7 | JEvent->update() | JROOT/libraries/joomla/event/dispatcher.php:159 |
| 6 | JEventDispatcher->trigger() | JROOT/libraries/joomla/application/base.php:106 |
| 5 | JApplicationBase->triggerEvent() | JROOT/libraries/cms/application/cms.php:1125 |
| 4 | JApplicationCms->route() | JROOT/libraries/cms/application/site.php:791 |
| 3 | JApplicationSite->route() | JROOT/libraries/cms/application/site.php:215 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 0.20 ms Nach letzter Abfrage: 0.09 ms Abfragespeichernutzung: 0.006 MB Speichernutzung vor Abfrage: 5.246 MB
UPDATE `adqlu_extensions`
SET `params` = '{\"mediaversion\":\"4d0e268407d7e8cd2aa52841804288e0\"}'
WHERE `type` = 'library'
AND `element` = 'joomla'
„EXPLAIN“ unmöglich für Abfrage: UPDATE `adqlu_extensions`
SET `params` = '{\"mediaversion\":\"4d0e268407d7e8cd2aa52841804288e0\"}'
WHERE `type` = 'library' AND `element` = 'joomla'
| Status | Duration |
|---|
| Starting | 0.02 ms |
| Checking permissions | 0.01 ms |
| Opening tables | 0.01 ms |
| After opening tables | 0.00 ms |
| System lock | 0.00 ms |
| Table lock | 0.00 ms |
| Init for update | 0.03 ms |
| Updating | 0.02 ms |
| End of update loop | 0.01 ms |
| Query end | 0.00 ms |
| Commit | 0.01 ms |
| Closing tables | 0.02 ms |
| Unlocking tables | 0.00 ms |
| Closing tables | 0.01 ms |
| Starting cleanup | 0.00 ms |
| Freeing items | 0.00 ms |
| Updating status | 0.01 ms |
| Reset for next command | 0.00 ms |
| # | Aufrufer | Datei und Zeilennummer | | 14 | JDatabaseDriverMysqli->execute() | JROOT/libraries/cms/library/helper.php:119 |
| 13 | JLibraryHelper::saveParams() | JROOT/libraries/cms/version/version.php:325 |
| 12 | JVersion->setMediaVersion() | JROOT/libraries/cms/version/version.php:284 |
| 11 | JVersion->getMediaVersion() | JROOT/libraries/joomla/factory.php:755 |
| 10 | JFactory::createDocument() | JROOT/libraries/joomla/factory.php:216 |
| 9 | JFactory::getDocument() | JROOT/plugins/system/gdpr/gdpr.php:1026 |
| 8 | plgSystemGdpr->onAfterRoute() | JROOT/libraries/joomla/event/event.php:69 |
| 7 | JEvent->update() | JROOT/libraries/joomla/event/dispatcher.php:159 |
| 6 | JEventDispatcher->trigger() | JROOT/libraries/joomla/application/base.php:106 |
| 5 | JApplicationBase->triggerEvent() | JROOT/libraries/cms/application/cms.php:1125 |
| 4 | JApplicationCms->route() | JROOT/libraries/cms/application/site.php:791 |
| 3 | JApplicationSite->route() | JROOT/libraries/cms/application/site.php:215 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 0.11 ms Nach letzter Abfrage: 0.74 ms Abfragespeichernutzung: 0.025 MB Speichernutzung vor Abfrage: 5.293 MB Zeilen zurückgegeben: 1
SELECT *
FROM adqlu_languages
WHERE published=1
ORDER BY ordering ASC
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | adqlu_languages | ALL | NULL | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 2 | Using where; filesort wurde genutzt |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.00 ms |
| Checking privileges on cached | 0.00 ms |
| Checking permissions | 0.01 ms |
| Sending cached result to clien | 0.01 ms |
| Updating status | 0.00 ms |
| Reset for next command | 0.00 ms |
| # | Aufrufer | Datei und Zeilennummer | | 7 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1689 |
| 6 | JDatabaseDriver->loadObjectList() | JROOT/libraries/joomla/language/helper.php:164 |
| 5 | JLanguageHelper::getLanguages() | JROOT/libraries/cms/application/site.php:329 |
| 4 | JApplicationSite->getParams() | JROOT/libraries/cms/application/site.php:135 |
| 3 | JApplicationSite->dispatch() | JROOT/libraries/cms/application/site.php:230 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 0.50 ms Nach letzter Abfrage: 2.85 ms Abfragespeichernutzung: 0.032 MB Speichernutzung vor Abfrage: 5.503 MB Zeilen zurückgegeben: 8
SHOW FULL COLUMNS
FROM `adqlu_assets`
„EXPLAIN“ unmöglich für Abfrage: SHOW FULL COLUMNS FROM `adqlu_assets`
| Status | Duration |
|---|
| Starting | 0.02 ms |
| Checking permissions | 0.00 ms |
| Closing tables | 0.00 ms |
| Opening tables | 0.17 ms |
| After opening tables | 0.00 ms |
| System lock | 0.00 ms |
| Table lock | 0.00 ms |
| Init | 0.01 ms |
| Optimizing | 0.01 ms |
| Statistics | 0.01 ms |
| Preparing | 0.01 ms |
| Executing | 0.00 ms |
| Filling schema table | 0.01 ms |
| Opening tables | 0.03 ms |
| After opening tables | 0.00 ms |
| Checking permissions | 0.05 ms |
| Closing tables | 0.01 ms |
| Executing | 0.00 ms |
| Sending data | 0.02 ms |
| End of update loop | 0.00 ms |
| Query end | 0.00 ms |
| Commit | 0.00 ms |
| Closing tables | 0.00 ms |
| Removing tmp table | 0.04 ms |
| Closing tables | 0.00 ms |
| Unlocking tables | 0.00 ms |
| Closing tables | 0.00 ms |
| Starting cleanup | 0.00 ms |
| Freeing items | 0.00 ms |
| Updating status | 0.01 ms |
| Reset for next command | 0.02 ms |
| # | Aufrufer | Datei und Zeilennummer | | 24 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1689 |
| 23 | JDatabaseDriver->loadObjectList() | JROOT/libraries/joomla/database/driver/mysqli.php:440 |
| 22 | JDatabaseDriverMysqli->getTableColumns() | JROOT/libraries/joomla/table/table.php:241 |
| 21 | JTable->getFields() | JROOT/libraries/joomla/table/table.php:162 |
| 20 | JTable->__construct() | JROOT/libraries/joomla/table/asset.php:60 |
| 19 | JTableAsset->__construct() | JROOT/libraries/joomla/table/table.php:308 |
| 18 | JTable::getInstance() | JROOT/libraries/joomla/access/access.php:696 |
| 17 | JAccess::getExtensionNameFromAsset() | JROOT/libraries/joomla/access/access.php:555 |
| 16 | JAccess::getAssetRules() | JROOT/libraries/joomla/user/user.php:385 |
| 15 | JUser->authorise() | JROOT/components/com_content/models/category.php:142 |
| 14 | ContentModelCategory->populateState() | JROOT/libraries/legacy/model/legacy.php:435 |
| 13 | JModelLegacy->getState() | JROOT/libraries/legacy/view/legacy.php:408 |
| 12 | JViewLegacy->get() | JROOT/libraries/legacy/view/category.php:114 |
| 11 | JViewCategory->commonCategoryDisplay() | JROOT/components/com_content/views/category/view.html.php:72 |
| 10 | ContentViewCategory->display() | JROOT/libraries/legacy/controller/legacy.php:664 |
| 9 | JControllerLegacy->display() | JROOT/components/com_content/controller.php:113 |
| 8 | ContentController->display() | JROOT/libraries/legacy/controller/legacy.php:702 |
| 7 | JControllerLegacy->execute() | JROOT/components/com_content/content.php:38 |
| 6 | require_once JROOT/components/com_content/content.php | JROOT/libraries/cms/component/helper.php:405 |
| 5 | JComponentHelper::executeComponent() | JROOT/libraries/cms/component/helper.php:380 |
| 4 | JComponentHelper::renderComponent() | JROOT/libraries/cms/application/site.php:191 |
| 3 | JApplicationSite->dispatch() | JROOT/libraries/cms/application/site.php:230 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 0.11 ms Nach letzter Abfrage: 0.49 ms Abfragespeichernutzung: 0.029 MB Speichernutzung vor Abfrage: 5.534 MB Zeilen zurückgegeben: 1
SELECT *
FROM adqlu_assets
WHERE `id` = '1'
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | adqlu_assets | const | PRIMARY | PRIMARY | 4 | const | 1 | |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.00 ms |
| Checking privileges on cached | 0.00 ms |
| Checking permissions | 0.00 ms |
| Sending cached result to clien | 0.01 ms |
| Updating status | 0.00 ms |
| Reset for next command | 0.00 ms |
| # | Aufrufer | Datei und Zeilennummer | | 20 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1453 |
| 19 | JDatabaseDriver->loadAssoc() | JROOT/libraries/joomla/table/table.php:719 |
| 18 | JTable->load() | JROOT/libraries/joomla/access/access.php:697 |
| 17 | JAccess::getExtensionNameFromAsset() | JROOT/libraries/joomla/access/access.php:555 |
| 16 | JAccess::getAssetRules() | JROOT/libraries/joomla/user/user.php:385 |
| 15 | JUser->authorise() | JROOT/components/com_content/models/category.php:142 |
| 14 | ContentModelCategory->populateState() | JROOT/libraries/legacy/model/legacy.php:435 |
| 13 | JModelLegacy->getState() | JROOT/libraries/legacy/view/legacy.php:408 |
| 12 | JViewLegacy->get() | JROOT/libraries/legacy/view/category.php:114 |
| 11 | JViewCategory->commonCategoryDisplay() | JROOT/components/com_content/views/category/view.html.php:72 |
| 10 | ContentViewCategory->display() | JROOT/libraries/legacy/controller/legacy.php:664 |
| 9 | JControllerLegacy->display() | JROOT/components/com_content/controller.php:113 |
| 8 | ContentController->display() | JROOT/libraries/legacy/controller/legacy.php:702 |
| 7 | JControllerLegacy->execute() | JROOT/components/com_content/content.php:38 |
| 6 | require_once JROOT/components/com_content/content.php | JROOT/libraries/cms/component/helper.php:405 |
| 5 | JComponentHelper::executeComponent() | JROOT/libraries/cms/component/helper.php:380 |
| 4 | JComponentHelper::renderComponent() | JROOT/libraries/cms/application/site.php:191 |
| 3 | JApplicationSite->dispatch() | JROOT/libraries/cms/application/site.php:230 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 0.11 ms Nach letzter Abfrage: 0.06 ms Abfragespeichernutzung: 0.026 MB Speichernutzung vor Abfrage: 5.541 MB Zeilen zurückgegeben: 1
SELECT a.rules
FROM adqlu_assets AS a
WHERE (a.id = 1 OR a.name = 'root.1')
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | a | index_merge | PRIMARY,idx_asset_name | PRIMARY,idx_asset_name | 4,202 | NULL | 2 | Using union(PRIMARY,idx_asset_name); Using where |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.00 ms |
| Checking privileges on cached | 0.00 ms |
| Checking permissions | 0.00 ms |
| Sending cached result to clien | 0.01 ms |
| Updating status | 0.00 ms |
| Reset for next command | 0.00 ms |
| # | Aufrufer | Datei und Zeilennummer | | 18 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1538 |
| 17 | JDatabaseDriver->loadColumn() | JROOT/libraries/joomla/access/access.php:652 |
| 16 | JAccess::getAssetRules() | JROOT/libraries/joomla/user/user.php:385 |
| 15 | JUser->authorise() | JROOT/components/com_content/models/category.php:142 |
| 14 | ContentModelCategory->populateState() | JROOT/libraries/legacy/model/legacy.php:435 |
| 13 | JModelLegacy->getState() | JROOT/libraries/legacy/view/legacy.php:408 |
| 12 | JViewLegacy->get() | JROOT/libraries/legacy/view/category.php:114 |
| 11 | JViewCategory->commonCategoryDisplay() | JROOT/components/com_content/views/category/view.html.php:72 |
| 10 | ContentViewCategory->display() | JROOT/libraries/legacy/controller/legacy.php:664 |
| 9 | JControllerLegacy->display() | JROOT/components/com_content/controller.php:113 |
| 8 | ContentController->display() | JROOT/libraries/legacy/controller/legacy.php:702 |
| 7 | JControllerLegacy->execute() | JROOT/components/com_content/content.php:38 |
| 6 | require_once JROOT/components/com_content/content.php | JROOT/libraries/cms/component/helper.php:405 |
| 5 | JComponentHelper::executeComponent() | JROOT/libraries/cms/component/helper.php:380 |
| 4 | JComponentHelper::renderComponent() | JROOT/libraries/cms/application/site.php:191 |
| 3 | JApplicationSite->dispatch() | JROOT/libraries/cms/application/site.php:230 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 0.17 ms Nach letzter Abfrage: 0.40 ms Abfragespeichernutzung: 0.057 MB Speichernutzung vor Abfrage: 5.554 MB Zeilen zurückgegeben: 458
SELECT a.id, a.parent_id
FROM adqlu_assets AS a
WHERE (a.name LIKE 'com_content.%' OR a.name = 'com_content' OR a.id = 1)
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | a | ALL | PRIMARY,idx_asset_name | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 1145 | Using where |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.00 ms |
| Checking privileges on cached | 0.00 ms |
| Checking permissions | 0.00 ms |
| Sending cached result to clien | 0.01 ms |
| Updating status | 0.02 ms |
| Reset for next command | 0.00 ms |
| # | Aufrufer | Datei und Zeilennummer | | 20 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1689 |
| 19 | JDatabaseDriver->loadObjectList() | JROOT/libraries/joomla/access/access.php:332 |
| 18 | JAccess::preloadPermissionsParentIdMapping() | JROOT/libraries/joomla/access/access.php:240 |
| 17 | JAccess::preload() | JROOT/libraries/joomla/access/access.php:168 |
| 16 | JAccess::check() | JROOT/libraries/joomla/user/user.php:394 |
| 15 | JUser->authorise() | JROOT/components/com_content/models/category.php:142 |
| 14 | ContentModelCategory->populateState() | JROOT/libraries/legacy/model/legacy.php:435 |
| 13 | JModelLegacy->getState() | JROOT/libraries/legacy/view/legacy.php:408 |
| 12 | JViewLegacy->get() | JROOT/libraries/legacy/view/category.php:114 |
| 11 | JViewCategory->commonCategoryDisplay() | JROOT/components/com_content/views/category/view.html.php:72 |
| 10 | ContentViewCategory->display() | JROOT/libraries/legacy/controller/legacy.php:664 |
| 9 | JControllerLegacy->display() | JROOT/components/com_content/controller.php:113 |
| 8 | ContentController->display() | JROOT/libraries/legacy/controller/legacy.php:702 |
| 7 | JControllerLegacy->execute() | JROOT/components/com_content/content.php:38 |
| 6 | require_once JROOT/components/com_content/content.php | JROOT/libraries/cms/component/helper.php:405 |
| 5 | JComponentHelper::executeComponent() | JROOT/libraries/cms/component/helper.php:380 |
| 4 | JComponentHelper::renderComponent() | JROOT/libraries/cms/application/site.php:191 |
| 3 | JApplicationSite->dispatch() | JROOT/libraries/cms/application/site.php:230 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 0.15 ms Nach letzter Abfrage: 0.49 ms Abfragespeichernutzung: 0.129 MB Speichernutzung vor Abfrage: 5.797 MB Zeilen zurückgegeben: 458
SELECT a.id, a.name, a.rules
FROM adqlu_assets AS a
WHERE (a.name LIKE 'com_content.%' OR a.name = 'com_content' OR a.id = 1 )
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | a | ALL | PRIMARY,idx_asset_name | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 1145 | Using where |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.00 ms |
| Checking privileges on cached | 0.00 ms |
| Checking permissions | 0.00 ms |
| Sending cached result to clien | 0.03 ms |
| Updating status | 0.00 ms |
| Reset for next command | 0.00 ms |
| # | Aufrufer | Datei und Zeilennummer | | 20 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1255 |
| 19 | JDatabaseDriver->getIterator() | JROOT/libraries/joomla/access/access.php:373 |
| 18 | JAccess::preloadPermissions() | JROOT/libraries/joomla/access/access.php:243 |
| 17 | JAccess::preload() | JROOT/libraries/joomla/access/access.php:168 |
| 16 | JAccess::check() | JROOT/libraries/joomla/user/user.php:394 |
| 15 | JUser->authorise() | JROOT/components/com_content/models/category.php:142 |
| 14 | ContentModelCategory->populateState() | JROOT/libraries/legacy/model/legacy.php:435 |
| 13 | JModelLegacy->getState() | JROOT/libraries/legacy/view/legacy.php:408 |
| 12 | JViewLegacy->get() | JROOT/libraries/legacy/view/category.php:114 |
| 11 | JViewCategory->commonCategoryDisplay() | JROOT/components/com_content/views/category/view.html.php:72 |
| 10 | ContentViewCategory->display() | JROOT/libraries/legacy/controller/legacy.php:664 |
| 9 | JControllerLegacy->display() | JROOT/components/com_content/controller.php:113 |
| 8 | ContentController->display() | JROOT/libraries/legacy/controller/legacy.php:702 |
| 7 | JControllerLegacy->execute() | JROOT/components/com_content/content.php:38 |
| 6 | require_once JROOT/components/com_content/content.php | JROOT/libraries/cms/component/helper.php:405 |
| 5 | JComponentHelper::executeComponent() | JROOT/libraries/cms/component/helper.php:380 |
| 4 | JComponentHelper::renderComponent() | JROOT/libraries/cms/application/site.php:191 |
| 3 | JApplicationSite->dispatch() | JROOT/libraries/cms/application/site.php:230 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 1.76 ms Nach letzter Abfrage: 0.89 ms Abfragespeichernutzung: 0.038 MB Speichernutzung vor Abfrage: 6.174 MB Zeilen zurückgegeben: 2
SELECT c.id, c.asset_id, c.access, c.alias, c.checked_out, c.checked_out_time,
c.created_time, c.created_user_id, c.description, c.extension, c.hits, c.language, c.level,
c.lft, c.metadata, c.metadesc, c.metakey, c.modified_time, c.note, c.params, c.parent_id,
c.path, c.published, c.rgt, c.title, c.modified_user_id, c.version,
CASE WHEN CHAR_LENGTH(c.alias) != 0 THEN CONCAT_WS(':', c.id, c.alias) ELSE c.id END as slug,COUNT(i.`id`) AS numitems
FROM adqlu_categories as c
LEFT JOIN (SELECT cat.id as id
FROM adqlu_categories AS cat JOIN adqlu_categories AS parent
ON cat.lft BETWEEN parent.lft
AND parent.rgt
WHERE parent.extension = 'com_content'
AND parent.published != 1
GROUP BY cat.id) AS badcats
ON badcats.id = c.id
LEFT JOIN adqlu_categories AS s
ON (s.lft <= c.lft
AND s.rgt >= c.rgt) OR (s.lft > c.lft
AND s.rgt < c.rgt)
LEFT JOIN `adqlu_content` AS i
ON i.`catid` = c.id
AND i.state = 1
WHERE (c.extension='com_content' OR c.extension='system')
AND c.access IN (1,1)
AND c.published = 1
AND badcats.id is null
AND s.id=38
GROUP BY c.id, c.asset_id, c.access, c.alias, c.checked_out, c.checked_out_time,
c.created_time, c.created_user_id, c.description, c.extension, c.hits, c.language, c.level,
c.lft, c.metadata, c.metadesc, c.metakey, c.modified_time, c.note, c.params, c.parent_id,
c.path, c.published, c.rgt, c.title, c.modified_user_id, c.version
ORDER BY c.lft
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | PRIMARY | s | const | PRIMARY,idx_left_right | PRIMARY | 4 | const | 1 | Using temporary; filesort wurde genutzt |
| 1 | PRIMARY | c | ALL | cat_idx,idx_access,idx_left_right | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 38 | Using where |
| 1 | PRIMARY | i | ref | idx_state,idx_catid | idx_catid | 4 | staging_otterbein.c.id | 6 | Using where |
| 1 | PRIMARY | <derived2> | ref | key0 | key0 | 5 | staging_otterbein.c.id | 10 | Using where |
| 2 | DERIVED | parent | ref | cat_idx,idx_left_right | cat_idx | 202 | const | 9 | Using index condition; Using temporary; filesort wurde genutzt |
| 2 | DERIVED | cat | index | PRIMARY,idx_left_right | idx_left_right | 8 | NULL | 38 | Using where; Using index; Using join buffer (flat, BNL join) |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.11 ms |
| Checking permissions | 0.01 ms |
| Opening tables | 0.03 ms |
| After opening tables | 0.01 ms |
| System lock | 0.00 ms |
| Table lock | 0.00 ms |
| Waiting for query cache lock | 0.02 ms |
| Init | 0.07 ms |
| Optimizing | 0.03 ms |
| Optimizing | 0.01 ms |
| Statistics | 0.04 ms |
| Statistics | 0.07 ms |
| Preparing | 0.01 ms |
| Creating tmp table | 0.01 ms |
| Sorting result | 0.01 ms |
| Preparing | 0.00 ms |
| Unlocking tables | 0.00 ms |
| Preparing | 0.03 ms |
| Creating tmp table | 0.03 ms |
| Sorting result | 0.01 ms |
| Executing | 0.00 ms |
| Sending data | 0.03 ms |
| Executing | 0.00 ms |
| Sending data | 0.09 ms |
| Creating sort index | 0.01 ms |
| Removing tmp table | 0.00 ms |
| Creating sort index | 0.88 ms |
| Creating sort index | 0.02 ms |
| Removing tmp table | 0.05 ms |
| Creating sort index | 0.01 ms |
| End of update loop | 0.01 ms |
| Query end | 0.00 ms |
| Commit | 0.00 ms |
| Closing tables | 0.00 ms |
| Removing tmp table | 0.00 ms |
| Closing tables | 0.00 ms |
| Unlocking tables | 0.00 ms |
| Closing tables | 0.01 ms |
| Starting cleanup | 0.00 ms |
| Freeing items | 0.01 ms |
| Updating status | 0.00 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.03 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.00 ms |
| Storing result in query cache | 0.00 ms |
| Reset for next command | 0.01 ms |
| # | Aufrufer | Datei und Zeilennummer | | 17 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1689 |
| 16 | JDatabaseDriver->loadObjectList() | JROOT/libraries/legacy/categories/categories.php:309 |
| 15 | JCategories->_load() | JROOT/libraries/legacy/categories/categories.php:184 |
| 14 | JCategories->get() | JROOT/components/com_content/models/category.php:354 |
| 13 | ContentModelCategory->getCategory() | JROOT/libraries/legacy/view/legacy.php:408 |
| 12 | JViewLegacy->get() | JROOT/libraries/legacy/view/category.php:115 |
| 11 | JViewCategory->commonCategoryDisplay() | JROOT/components/com_content/views/category/view.html.php:72 |
| 10 | ContentViewCategory->display() | JROOT/libraries/legacy/controller/legacy.php:664 |
| 9 | JControllerLegacy->display() | JROOT/components/com_content/controller.php:113 |
| 8 | ContentController->display() | JROOT/libraries/legacy/controller/legacy.php:702 |
| 7 | JControllerLegacy->execute() | JROOT/components/com_content/content.php:38 |
| 6 | require_once JROOT/components/com_content/content.php | JROOT/libraries/cms/component/helper.php:405 |
| 5 | JComponentHelper::executeComponent() | JROOT/libraries/cms/component/helper.php:380 |
| 4 | JComponentHelper::renderComponent() | JROOT/libraries/cms/application/site.php:191 |
| 3 | JApplicationSite->dispatch() | JROOT/libraries/cms/application/site.php:230 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 0.11 ms Nach letzter Abfrage: 0.38 ms Abfragespeichernutzung: 0.030 MB Speichernutzung vor Abfrage: 6.205 MB Zeilen zurückgegeben: 46
SELECT element
FROM adqlu_extensions
WHERE type = 'component'
AND enabled = '1'
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | adqlu_extensions | ref | extension | extension | 82 | const | 47 | Using index condition; Using where |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.00 ms |
| Checking privileges on cached | 0.00 ms |
| Checking permissions | 0.00 ms |
| Sending cached result to clien | 0.01 ms |
| Updating status | 0.00 ms |
| Reset for next command | 0.00 ms |
| # | Aufrufer | Datei und Zeilennummer | | 23 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1538 |
| 22 | JDatabaseDriver->loadColumn() | JROOT/libraries/joomla/access/access.php:413 |
| 21 | JAccess::preloadComponents() | JROOT/libraries/joomla/access/access.php:213 |
| 20 | JAccess::preload() | JROOT/libraries/joomla/access/access.php:168 |
| 19 | JAccess::check() | JROOT/libraries/joomla/user/user.php:394 |
| 18 | JUser->authorise() | JROOT/components/com_content/models/articles.php:466 |
| 17 | ContentModelArticles->getListQuery() | JROOT/libraries/legacy/model/list.php:129 |
| 16 | JModelList->_getListQuery() | JROOT/libraries/legacy/model/list.php:183 |
| 15 | JModelList->getItems() | JROOT/components/com_content/models/articles.php:565 |
| 14 | ContentModelArticles->getItems() | JROOT/components/com_content/models/category.php:253 |
| 13 | ContentModelCategory->getItems() | JROOT/libraries/legacy/view/legacy.php:408 |
| 12 | JViewLegacy->get() | JROOT/libraries/legacy/view/category.php:128 |
| 11 | JViewCategory->commonCategoryDisplay() | JROOT/components/com_content/views/category/view.html.php:72 |
| 10 | ContentViewCategory->display() | JROOT/libraries/legacy/controller/legacy.php:664 |
| 9 | JControllerLegacy->display() | JROOT/components/com_content/controller.php:113 |
| 8 | ContentController->display() | JROOT/libraries/legacy/controller/legacy.php:702 |
| 7 | JControllerLegacy->execute() | JROOT/components/com_content/content.php:38 |
| 6 | require_once JROOT/components/com_content/content.php | JROOT/libraries/cms/component/helper.php:405 |
| 5 | JComponentHelper::executeComponent() | JROOT/libraries/cms/component/helper.php:380 |
| 4 | JComponentHelper::renderComponent() | JROOT/libraries/cms/application/site.php:191 |
| 3 | JApplicationSite->dispatch() | JROOT/libraries/cms/application/site.php:230 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 0.11 ms Nach letzter Abfrage: 0.07 ms Abfragespeichernutzung: 0.031 MB Speichernutzung vor Abfrage: 6.221 MB Zeilen zurückgegeben: 46
SELECT a.name, a.rules
FROM adqlu_assets AS a
WHERE (a.name IN ('com_admin','com_ajax','com_banners','com_cache','com_categories','com_checkin','com_config','com_contact','com_content','com_contenthistory','com_contentmap','com_cpanel','com_customfilters','com_djimageslider','com_finder','com_flippingbook','com_gdpr','com_installer','com_jce','com_jmap','com_joomlaupdate','com_languages','com_listmanager','com_login','com_mailto','com_media','com_menus','com_messages','com_modules','com_newsfeeds','com_phocagallery','com_plugins','com_postinstall','com_redirect','com_search','com_seoglossary','com_tags','com_tcpdf','com_templates','com_users','com_virtuemart','com_virtuemart_allinone','com_virtuemart_magicscroll','com_virtuemart_magiczoomplus','com_weblinks','com_wrapper') OR a.name = 'root.1')
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | a | range | idx_asset_name | idx_asset_name | 202 | NULL | 47 | Using index condition; Using where |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.01 ms |
| Checking privileges on cached | 0.00 ms |
| Checking permissions | 0.00 ms |
| Sending cached result to clien | 0.01 ms |
| Updating status | 0.00 ms |
| Reset for next command | 0.00 ms |
| # | Aufrufer | Datei und Zeilennummer | | 23 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1494 |
| 22 | JDatabaseDriver->loadAssocList() | JROOT/libraries/joomla/access/access.php:441 |
| 21 | JAccess::preloadComponents() | JROOT/libraries/joomla/access/access.php:213 |
| 20 | JAccess::preload() | JROOT/libraries/joomla/access/access.php:168 |
| 19 | JAccess::check() | JROOT/libraries/joomla/user/user.php:394 |
| 18 | JUser->authorise() | JROOT/components/com_content/models/articles.php:466 |
| 17 | ContentModelArticles->getListQuery() | JROOT/libraries/legacy/model/list.php:129 |
| 16 | JModelList->_getListQuery() | JROOT/libraries/legacy/model/list.php:183 |
| 15 | JModelList->getItems() | JROOT/components/com_content/models/articles.php:565 |
| 14 | ContentModelArticles->getItems() | JROOT/components/com_content/models/category.php:253 |
| 13 | ContentModelCategory->getItems() | JROOT/libraries/legacy/view/legacy.php:408 |
| 12 | JViewLegacy->get() | JROOT/libraries/legacy/view/category.php:128 |
| 11 | JViewCategory->commonCategoryDisplay() | JROOT/components/com_content/views/category/view.html.php:72 |
| 10 | ContentViewCategory->display() | JROOT/libraries/legacy/controller/legacy.php:664 |
| 9 | JControllerLegacy->display() | JROOT/components/com_content/controller.php:113 |
| 8 | ContentController->display() | JROOT/libraries/legacy/controller/legacy.php:702 |
| 7 | JControllerLegacy->execute() | JROOT/components/com_content/content.php:38 |
| 6 | require_once JROOT/components/com_content/content.php | JROOT/libraries/cms/component/helper.php:405 |
| 5 | JComponentHelper::executeComponent() | JROOT/libraries/cms/component/helper.php:380 |
| 4 | JComponentHelper::renderComponent() | JROOT/libraries/cms/application/site.php:191 |
| 3 | JApplicationSite->dispatch() | JROOT/libraries/cms/application/site.php:230 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 0.99 ms Nach letzter Abfrage: 0.47 ms Abfragespeichernutzung: 0.085 MB Speichernutzung vor Abfrage: 6.471 MB Zeilen zurückgegeben: 9
SELECT a.id, a.title, a.alias, a.introtext, a.fulltext, a.checked_out, a.checked_out_time, a.catid, a.created, a.created_by, a.created_by_alias,
CASE WHEN a.modified = '0000-00-00 00:00:00' THEN a.created ELSE a.modified END as modified, a.modified_by, uam.name as modified_by_name,
CASE WHEN a.publish_up = '0000-00-00 00:00:00' THEN a.created ELSE a.publish_up END as publish_up,a.publish_down, a.images, a.urls, a.attribs, a.metadata, a.metakey, a.metadesc, a.access, a.hits, a.xreference, a.featured, a.language, LENGTH(a.fulltext) AS readmore,
CASE WHEN badcats.id is not null THEN 0 ELSE a.state END AS state,c.title AS category_title, c.path AS category_route, c.access AS category_access, c.alias AS category_alias,
CASE WHEN a.created_by_alias > ' ' THEN a.created_by_alias ELSE ua.name END AS author,ua.email AS author_email,parent.title as parent_title, parent.id as parent_id, parent.path as parent_route, parent.alias as parent_alias,ROUND(v.rating_sum / v.rating_count, 0) AS rating, v.rating_count as rating_count,c.published,
CASE WHEN badcats.id is null THEN c.published ELSE 0 END AS parents_published
FROM adqlu_content AS a
LEFT JOIN adqlu_categories AS c
ON c.id = a.catid
LEFT JOIN adqlu_users AS ua
ON ua.id = a.created_by
LEFT JOIN adqlu_users AS uam
ON uam.id = a.modified_by
LEFT JOIN adqlu_categories as parent
ON parent.id = c.parent_id
LEFT JOIN adqlu_content_rating AS v
ON a.id = v.content_id
LEFT
OUTER JOIN (SELECT cat.id as id
FROM adqlu_categories AS cat JOIN adqlu_categories AS parent
ON cat.lft BETWEEN parent.lft
AND parent.rgt
WHERE parent.extension = 'com_content'
AND parent.published != 1
GROUP BY cat.id ) AS badcats
ON badcats.id = c.id
WHERE a.access IN (1,1)
AND c.access IN (1,1)
AND
CASE WHEN badcats.id is null THEN a.state ELSE 0 END = 1
AND a.catid = 38
AND (a.publish_up = '0000-00-00 00:00:00' OR a.publish_up <= '2026-09-04 05:38:39')
AND (a.publish_down = '0000-00-00 00:00:00' OR a.publish_down >= '2026-09-04 05:38:39')
ORDER BY c.lft,
CASE WHEN a.publish_up = '0000-00-00 00:00:00' THEN a.created ELSE a.publish_up END DESC , a.created
LIMIT 9
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | PRIMARY | c | const | PRIMARY,idx_access | PRIMARY | 4 | const | 1 | |
| 1 | PRIMARY | a | ref | idx_access,idx_catid | idx_catid | 4 | const | 44 | Using where; filesort wurde genutzt |
| 1 | PRIMARY | ua | eq_ref | PRIMARY | PRIMARY | 4 | staging_otterbein.a.created_by | 1 | Using where |
| 1 | PRIMARY | uam | eq_ref | PRIMARY | PRIMARY | 4 | staging_otterbein.a.modified_by | 1 | Using where |
| 1 | PRIMARY | parent | eq_ref | PRIMARY | PRIMARY | 4 | const | 1 | Using where |
| 1 | PRIMARY | v | eq_ref | PRIMARY | PRIMARY | 4 | staging_otterbein.a.id | 1 | Using where |
| 1 | PRIMARY | <derived2> | ref | key0 | key0 | 5 | const | 10 | Using where |
| 2 | DERIVED | parent | ref | cat_idx,idx_left_right | cat_idx | 202 | const | 9 | Using index condition; Using temporary; filesort wurde genutzt |
| 2 | DERIVED | cat | index | PRIMARY,idx_left_right | idx_left_right | 8 | NULL | 38 | Using where; Using index; Using join buffer (flat, BNL join) |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.12 ms |
| Checking permissions | 0.00 ms |
| Opening tables | 0.03 ms |
| After opening tables | 0.00 ms |
| System lock | 0.00 ms |
| Table lock | 0.00 ms |
| Waiting for query cache lock | 0.02 ms |
| Init | 0.06 ms |
| Optimizing | 0.03 ms |
| Optimizing | 0.01 ms |
| Statistics | 0.03 ms |
| Statistics | 0.05 ms |
| Preparing | 0.01 ms |
| Creating tmp table | 0.01 ms |
| Sorting result | 0.01 ms |
| Preparing | 0.00 ms |
| Unlocking tables | 0.00 ms |
| Preparing | 0.02 ms |
| Sorting result | 0.01 ms |
| Executing | 0.00 ms |
| Sending data | 0.02 ms |
| Creating sort index | 0.15 ms |
| Executing | 0.00 ms |
| Sending data | 0.09 ms |
| Creating sort index | 0.01 ms |
| Removing tmp table | 0.00 ms |
| Creating sort index | 0.04 ms |
| Waiting for query cache lock | 0.00 ms |
| Creating sort index | 0.04 ms |
| Waiting for query cache lock | 0.00 ms |
| Creating sort index | 0.03 ms |
| End of update loop | 0.00 ms |
| Query end | 0.00 ms |
| Commit | 0.00 ms |
| Closing tables | 0.00 ms |
| Removing tmp table | 0.00 ms |
| Closing tables | 0.00 ms |
| Unlocking tables | 0.00 ms |
| Closing tables | 0.01 ms |
| Starting cleanup | 0.00 ms |
| Freeing items | 0.01 ms |
| Updating status | 0.00 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.03 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.00 ms |
| Storing result in query cache | 0.00 ms |
| Reset for next command | 0.01 ms |
| # | Aufrufer | Datei und Zeilennummer | | 18 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1689 |
| 17 | JDatabaseDriver->loadObjectList() | JROOT/libraries/legacy/model/legacy.php:310 |
| 16 | JModelLegacy->_getList() | JROOT/libraries/legacy/model/list.php:183 |
| 15 | JModelList->getItems() | JROOT/components/com_content/models/articles.php:565 |
| 14 | ContentModelArticles->getItems() | JROOT/components/com_content/models/category.php:253 |
| 13 | ContentModelCategory->getItems() | JROOT/libraries/legacy/view/legacy.php:408 |
| 12 | JViewLegacy->get() | JROOT/libraries/legacy/view/category.php:128 |
| 11 | JViewCategory->commonCategoryDisplay() | JROOT/components/com_content/views/category/view.html.php:72 |
| 10 | ContentViewCategory->display() | JROOT/libraries/legacy/controller/legacy.php:664 |
| 9 | JControllerLegacy->display() | JROOT/components/com_content/controller.php:113 |
| 8 | ContentController->display() | JROOT/libraries/legacy/controller/legacy.php:702 |
| 7 | JControllerLegacy->execute() | JROOT/components/com_content/content.php:38 |
| 6 | require_once JROOT/components/com_content/content.php | JROOT/libraries/cms/component/helper.php:405 |
| 5 | JComponentHelper::executeComponent() | JROOT/libraries/cms/component/helper.php:380 |
| 4 | JComponentHelper::renderComponent() | JROOT/libraries/cms/application/site.php:191 |
| 3 | JApplicationSite->dispatch() | JROOT/libraries/cms/application/site.php:230 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 0.65 ms Nach letzter Abfrage: 0.63 ms Abfragespeichernutzung: 0.026 MB Speichernutzung vor Abfrage: 6.766 MB Zeilen zurückgegeben: 1
SELECT COUNT(*)
FROM adqlu_content AS a
LEFT JOIN adqlu_categories AS c
ON c.id = a.catid
LEFT JOIN adqlu_users AS ua
ON ua.id = a.created_by
LEFT JOIN adqlu_users AS uam
ON uam.id = a.modified_by
LEFT JOIN adqlu_categories as parent
ON parent.id = c.parent_id
LEFT JOIN adqlu_content_rating AS v
ON a.id = v.content_id
LEFT
OUTER JOIN (SELECT cat.id as id
FROM adqlu_categories AS cat JOIN adqlu_categories AS parent
ON cat.lft BETWEEN parent.lft
AND parent.rgt
WHERE parent.extension = 'com_content'
AND parent.published != 1
GROUP BY cat.id ) AS badcats
ON badcats.id = c.id
WHERE a.access IN (1,1)
AND c.access IN (1,1)
AND
CASE WHEN badcats.id is null THEN a.state ELSE 0 END = 1
AND a.catid = 38
AND (a.publish_up = '0000-00-00 00:00:00' OR a.publish_up <= '2026-09-04 05:38:39')
AND (a.publish_down = '0000-00-00 00:00:00' OR a.publish_down >= '2026-09-04 05:38:39')
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | PRIMARY | c | const | PRIMARY,idx_access | PRIMARY | 4 | const | 1 | |
| 1 | PRIMARY | a | ref | idx_access,idx_catid | idx_catid | 4 | const | 44 | Using where |
| 1 | PRIMARY | <derived2> | ref | key0 | key0 | 5 | const | 10 | Using where |
| 2 | DERIVED | parent | ref | cat_idx,idx_left_right | cat_idx | 202 | const | 9 | Using index condition; Using temporary; filesort wurde genutzt |
| 2 | DERIVED | cat | index | PRIMARY,idx_left_right | idx_left_right | 8 | NULL | 38 | Using where; Using index; Using join buffer (flat, BNL join) |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.06 ms |
| Checking permissions | 0.00 ms |
| Opening tables | 0.02 ms |
| After opening tables | 0.00 ms |
| System lock | 0.00 ms |
| Table lock | 0.00 ms |
| Waiting for query cache lock | 0.01 ms |
| Init | 0.03 ms |
| Optimizing | 0.02 ms |
| Optimizing | 0.01 ms |
| Statistics | 0.03 ms |
| Statistics | 0.04 ms |
| Preparing | 0.01 ms |
| Creating tmp table | 0.01 ms |
| Sorting result | 0.01 ms |
| Preparing | 0.00 ms |
| Unlocking tables | 0.00 ms |
| Preparing | 0.02 ms |
| Executing | 0.00 ms |
| Sending data | 0.03 ms |
| Executing | 0.00 ms |
| Sending data | 0.08 ms |
| Creating sort index | 0.01 ms |
| Removing tmp table | 0.00 ms |
| Creating sort index | 0.08 ms |
| End of update loop | 0.00 ms |
| Query end | 0.00 ms |
| Commit | 0.00 ms |
| Closing tables | 0.00 ms |
| Removing tmp table | 0.00 ms |
| Closing tables | 0.00 ms |
| Unlocking tables | 0.00 ms |
| Closing tables | 0.01 ms |
| Starting cleanup | 0.00 ms |
| Freeing items | 0.01 ms |
| Updating status | 0.00 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.00 ms |
| Storing result in query cache | 0.03 ms |
| Reset for next command | 0.01 ms |
| # | Aufrufer | Datei und Zeilennummer | | 18 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1728 |
| 17 | JDatabaseDriver->loadResult() | JROOT/libraries/legacy/model/legacy.php:337 |
| 16 | JModelLegacy->_getListCount() | JROOT/libraries/legacy/model/list.php:278 |
| 15 | JModelList->getTotal() | JROOT/libraries/legacy/model/list.php:228 |
| 14 | JModelList->getPagination() | JROOT/components/com_content/models/category.php:265 |
| 13 | ContentModelCategory->getItems() | JROOT/libraries/legacy/view/legacy.php:408 |
| 12 | JViewLegacy->get() | JROOT/libraries/legacy/view/category.php:128 |
| 11 | JViewCategory->commonCategoryDisplay() | JROOT/components/com_content/views/category/view.html.php:72 |
| 10 | ContentViewCategory->display() | JROOT/libraries/legacy/controller/legacy.php:664 |
| 9 | JControllerLegacy->display() | JROOT/components/com_content/controller.php:113 |
| 8 | ContentController->display() | JROOT/libraries/legacy/controller/legacy.php:702 |
| 7 | JControllerLegacy->execute() | JROOT/components/com_content/content.php:38 |
| 6 | require_once JROOT/components/com_content/content.php | JROOT/libraries/cms/component/helper.php:405 |
| 5 | JComponentHelper::executeComponent() | JROOT/libraries/cms/component/helper.php:380 |
| 4 | JComponentHelper::renderComponent() | JROOT/libraries/cms/application/site.php:191 |
| 3 | JApplicationSite->dispatch() | JROOT/libraries/cms/application/site.php:230 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 0.48 ms Nach letzter Abfrage: 0.38 ms Abfragespeichernutzung: 0.035 MB Speichernutzung vor Abfrage: 6.777 MB Zeilen zurückgegeben: 0
SELECT `m`.`tag_id`,`t`.*
FROM `adqlu_contentitem_tag_map` AS m
INNER JOIN `adqlu_tags` AS t
ON `m`.`tag_id` = `t`.`id`
WHERE `m`.`type_alias` = 'com_content.category'
AND `m`.`content_item_id` = 38
AND `t`.`published` = 1
AND t.access IN (1,1)
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | t | ALL | PRIMARY,tag_idx,idx_access | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 59 | Using where |
| 1 | SIMPLE | m | ref | idx_tag_type | idx_tag_type | 4 | staging_otterbein.t.id | 4 | Using index condition; Using where |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.02 ms |
| Checking permissions | 0.00 ms |
| Opening tables | 0.02 ms |
| After opening tables | 0.00 ms |
| System lock | 0.00 ms |
| Table lock | 0.00 ms |
| Waiting for query cache lock | 0.01 ms |
| Init | 0.02 ms |
| Optimizing | 0.01 ms |
| Statistics | 0.03 ms |
| Preparing | 0.02 ms |
| Executing | 0.00 ms |
| Sending data | 0.19 ms |
| End of update loop | 0.00 ms |
| Query end | 0.00 ms |
| Commit | 0.00 ms |
| Closing tables | 0.00 ms |
| Unlocking tables | 0.00 ms |
| Closing tables | 0.01 ms |
| Starting cleanup | 0.00 ms |
| Freeing items | 0.01 ms |
| Updating status | 0.00 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.00 ms |
| Storing result in query cache | 0.01 ms |
| Reset for next command | 0.00 ms |
| # | Aufrufer | Datei und Zeilennummer | | 14 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1689 |
| 13 | JDatabaseDriver->loadObjectList() | JROOT/libraries/cms/helper/tags.php:435 |
| 12 | JHelperTags->getItemTags() | JROOT/libraries/legacy/view/category.php:217 |
| 11 | JViewCategory->commonCategoryDisplay() | JROOT/components/com_content/views/category/view.html.php:72 |
| 10 | ContentViewCategory->display() | JROOT/libraries/legacy/controller/legacy.php:664 |
| 9 | JControllerLegacy->display() | JROOT/components/com_content/controller.php:113 |
| 8 | ContentController->display() | JROOT/libraries/legacy/controller/legacy.php:702 |
| 7 | JControllerLegacy->execute() | JROOT/components/com_content/content.php:38 |
| 6 | require_once JROOT/components/com_content/content.php | JROOT/libraries/cms/component/helper.php:405 |
| 5 | JComponentHelper::executeComponent() | JROOT/libraries/cms/component/helper.php:380 |
| 4 | JComponentHelper::renderComponent() | JROOT/libraries/cms/application/site.php:191 |
| 3 | JApplicationSite->dispatch() | JROOT/libraries/cms/application/site.php:230 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 1.25 ms Nach letzter Abfrage: 6.19 ms Abfragespeichernutzung: 0.028 MB Speichernutzung vor Abfrage: 7.066 MB Zeilen zurückgegeben: 0
SELECT t.*
FROM adqlu_seoglossary t
LEFT JOIN adqlu_seoglossaries g
ON t.catid = g.id
WHERE t.state = 1
AND g.state = 1
AND ( LOWER('ZKW Otterbein schickt Zementdrehofen auf die 43. Ofenreise\nBereit für die Bausaison 2025\nGroßenlüder-Müs. Anfang März wurde bei den Zement- und Kalkwerken (ZKW) OTTERBEIN die jährliche „Winterreparatur“ mit einem feierlichen Moment abgeschlossen: der Zementdrehofen wurde gezündet und mit den besten Wünschen der Geschäftsführer Winfried Müller und Dr. Christian W. Müller, Werksleiter Dr. Tilman Scholten, dem Leiter Produktion und Technik Marc Sesselmann sowie Abteilungsleiter Klaus Neumann auf die 43. Ofenreise geschickt.\nDie Wiederaufnahme der Produktion ist eine wichtige Nachricht für die zahlreichen Bauvorhaben in der Region, deren zuverlässige Belieferung mit den hochwertigen OTTERBEIN-Zementen zu Beginn der laufenden Bausaison mit der nun erfolgten Ofenzündung sichergestellt ist. Neben einer hohen Produktqualität zeichnen sich die OTTERBEIN-Zemente durch eine umweltfreundliche und verantwortungsbewusste Herstellung aus, was erst jüngst mit dem renommierten CSC-Nachhaltigkeitszertifikat (Concrete Sustainability Council) bestätigt wurde. \"Nachhaltigkeit und Qualität gehen bei uns Hand in Hand. Auch in der Saison 2025 werden wir diese Ausrichtung konsequent weiterverfolgen und unseren Kunden innovative Lösungen bieten“, unterstreicht Geschäftsführer Dr. Christian W. Müller.\nIm Rahmen der sog. „Winterreparatur“ wird die Produktion einmal im Jahr gezielt heruntergefahren, um umfangreiche Instandhaltungs- und Modernisierungsarbeiten an den Anlagen durchzuführen. Insgesamt wurden rund 10.000 Arbeitsstunden geleistet und dabei – besonders erfreulich – keine Arbeitsunfälle verzeichnet. Die oberste Priorität während der gesamten Reparaturphase, die insgesamt 35 Tage andauerte, war die Sicherheit der beteiligten Mitarbeiterinnen und Mitarbeiter.\nIm Fokus standen dabei auch gezielte Optimierungen, um die Energieeffizienz der Drehofenanlage weiter zu verbessern und den CO2-Fußabdruck der Produktion auf innovative Weise zu reduzieren. Dazu zählen unter anderem Maßnahmen zur Optimierung des Wärmeübergangs im Wärmetauscherturm, wodurch der Energie¬einsatz noch effizienter genutzt werden kann und CO2 eingespart wird. Zudem wurden ca. 100 Tonnen Feuerfestmaterial fachgerecht erneuert, um den 42 Meter langen Ofenmantel bei Flammentemperaturen von rund 2.000 Grad Celsius effektiv über die bevorstehende einjährige Laufzeit zu schützen.\n\"Das erfolgreiche Abschließen dieser umfangreichen Arbeiten und die pünktliche Wiederaufnahme der Produktion sind ein Verdienst unseres engagierten Teams und unserer Partnerfirmen – ein herzlicher Dank gilt allen Beteiligten für ihren unermüdlichen Einsatz\", betont Werksleiter Dr. Tilman Scholten.\nBildunterschrift: Den Zementdrehofen auf die 43. Ofenreise geschickt: Dr. Christian W. Müller, Winfried Müller, Klaus Neumann, Marc Sesselmann und Dr. Tilman Scholten (v. rechts).\n\n\n\n\n\n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n\n\n\n View the embedded image gallery online at:\n \n https://staging.zkw-otterbein.de/aktuelles-zum-nachbarschaftsdialog#sigFreeId2ac42186d8\n\n\n\n\n\n') LIKE CONCAT('%', LOWER(t.tterm), '%') OR 'ZKW Otterbein schickt Zementdrehofen auf die 43. Ofenreise\nBereit für die Bausaison 2025\nGroßenlüder-Müs. Anfang März wurde bei den Zement- und Kalkwerken (ZKW) OTTERBEIN die jährliche „Winterreparatur“ mit einem feierlichen Moment abgeschlossen: der Zementdrehofen wurde gezündet und mit den besten Wünschen der Geschäftsführer Winfried Müller und Dr. Christian W. Müller, Werksleiter Dr. Tilman Scholten, dem Leiter Produktion und Technik Marc Sesselmann sowie Abteilungsleiter Klaus Neumann auf die 43. Ofenreise geschickt.\nDie Wiederaufnahme der Produktion ist eine wichtige Nachricht für die zahlreichen Bauvorhaben in der Region, deren zuverlässige Belieferung mit den hochwertigen OTTERBEIN-Zementen zu Beginn der laufenden Bausaison mit der nun erfolgten Ofenzündung sichergestellt ist. Neben einer hohen Produktqualität zeichnen sich die OTTERBEIN-Zemente durch eine umweltfreundliche und verantwortungsbewusste Herstellung aus, was erst jüngst mit dem renommierten CSC-Nachhaltigkeitszertifikat (Concrete Sustainability Council) bestätigt wurde. \"Nachhaltigkeit und Qualität gehen bei uns Hand in Hand. Auch in der Saison 2025 werden wir diese Ausrichtung konsequent weiterverfolgen und unseren Kunden innovative Lösungen bieten“, unterstreicht Geschäftsführer Dr. Christian W. Müller.\nIm Rahmen der sog. „Winterreparatur“ wird die Produktion einmal im Jahr gezielt heruntergefahren, um umfangreiche Instandhaltungs- und Modernisierungsarbeiten an den Anlagen durchzuführen. Insgesamt wurden rund 10.000 Arbeitsstunden geleistet und dabei – besonders erfreulich – keine Arbeitsunfälle verzeichnet. Die oberste Priorität während der gesamten Reparaturphase, die insgesamt 35 Tage andauerte, war die Sicherheit der beteiligten Mitarbeiterinnen und Mitarbeiter.\nIm Fokus standen dabei auch gezielte Optimierungen, um die Energieeffizienz der Drehofenanlage weiter zu verbessern und den CO2-Fußabdruck der Produktion auf innovative Weise zu reduzieren. Dazu zählen unter anderem Maßnahmen zur Optimierung des Wärmeübergangs im Wärmetauscherturm, wodurch der Energie¬einsatz noch effizienter genutzt werden kann und CO2 eingespart wird. Zudem wurden ca. 100 Tonnen Feuerfestmaterial fachgerecht erneuert, um den 42 Meter langen Ofenmantel bei Flammentemperaturen von rund 2.000 Grad Celsius effektiv über die bevorstehende einjährige Laufzeit zu schützen.\n\"Das erfolgreiche Abschließen dieser umfangreichen Arbeiten und die pünktliche Wiederaufnahme der Produktion sind ein Verdienst unseres engagierten Teams und unserer Partnerfirmen – ein herzlicher Dank gilt allen Beteiligten für ihren unermüdlichen Einsatz\", betont Werksleiter Dr. Tilman Scholten.\nBildunterschrift: Den Zementdrehofen auf die 43. Ofenreise geschickt: Dr. Christian W. Müller, Winfried Müller, Klaus Neumann, Marc Sesselmann und Dr. Tilman Scholten (v. rechts).\n\n\n\n\n\n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n\n\n\n View the embedded image gallery online at:\n \n https://staging.zkw-otterbein.de/aktuelles-zum-nachbarschaftsdialog#sigFreeId2ac42186d8\n\n\n\n\n\n' REGEXP REPLACE(REPLACE(tsynonyms, ', ', '|'), ',', '|') )
AND ( g.language LIKE 'de-DE' OR g.language = '*' )
ORDER BY ordering;
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | g | ALL | PRIMARY | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 2 | Using where; Using temporary; filesort wurde genutzt |
| 1 | SIMPLE | t | ALL | NULL | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 9 | Using where; Using join buffer (flat, BNL join) |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.10 ms |
| Checking permissions | 0.00 ms |
| Opening tables | 0.01 ms |
| After opening tables | 0.00 ms |
| System lock | 0.00 ms |
| Table lock | 0.00 ms |
| Waiting for query cache lock | 0.09 ms |
| Init | 0.05 ms |
| Optimizing | 0.02 ms |
| Statistics | 0.01 ms |
| Preparing | 0.01 ms |
| Creating tmp table | 0.02 ms |
| Sorting result | 0.01 ms |
| Executing | 0.00 ms |
| Sending data | 0.71 ms |
| Creating sort index | 0.01 ms |
| Removing tmp table | 0.02 ms |
| Creating sort index | 0.01 ms |
| End of update loop | 0.00 ms |
| Query end | 0.00 ms |
| Commit | 0.00 ms |
| Closing tables | 0.00 ms |
| Unlocking tables | 0.00 ms |
| Closing tables | 0.01 ms |
| Starting cleanup | 0.00 ms |
| Freeing items | 0.01 ms |
| Updating status | 0.00 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.00 ms |
| Storing result in query cache | 0.01 ms |
| Reset for next command | 0.01 ms |
| # | Aufrufer | Datei und Zeilennummer | | 15 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1689 |
| 14 | JDatabaseDriver->loadObjectList() | JROOT/plugins/content/seoglossary/seoglossary.php:263 |
| 13 | plgContentSeoglossary->onContentPrepare() | JROOT/libraries/joomla/event/event.php:69 |
| 12 | JEvent->update() | JROOT/libraries/joomla/event/dispatcher.php:159 |
| 11 | JEventDispatcher->trigger() | JROOT/components/com_content/views/category/view.html.php:106 |
| 10 | ContentViewCategory->display() | JROOT/libraries/legacy/controller/legacy.php:664 |
| 9 | JControllerLegacy->display() | JROOT/components/com_content/controller.php:113 |
| 8 | ContentController->display() | JROOT/libraries/legacy/controller/legacy.php:702 |
| 7 | JControllerLegacy->execute() | JROOT/components/com_content/content.php:38 |
| 6 | require_once JROOT/components/com_content/content.php | JROOT/libraries/cms/component/helper.php:405 |
| 5 | JComponentHelper::executeComponent() | JROOT/libraries/cms/component/helper.php:380 |
| 4 | JComponentHelper::renderComponent() | JROOT/libraries/cms/application/site.php:191 |
| 3 | JApplicationSite->dispatch() | JROOT/libraries/cms/application/site.php:230 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 0.48 ms Nach letzter Abfrage: 0.74 ms Abfragespeichernutzung: 0.038 MB Speichernutzung vor Abfrage: 7.090 MB Zeilen zurückgegeben: 30
SHOW FULL COLUMNS
FROM `adqlu_content`
„EXPLAIN“ unmöglich für Abfrage: SHOW FULL COLUMNS FROM `adqlu_content`
| Status | Duration |
|---|
| Starting | 0.02 ms |
| Checking permissions | 0.00 ms |
| Closing tables | 0.00 ms |
| Opening tables | 0.13 ms |
| After opening tables | 0.00 ms |
| System lock | 0.00 ms |
| Table lock | 0.00 ms |
| Init | 0.01 ms |
| Optimizing | 0.00 ms |
| Statistics | 0.01 ms |
| Preparing | 0.01 ms |
| Executing | 0.00 ms |
| Filling schema table | 0.01 ms |
| Opening tables | 0.01 ms |
| After opening tables | 0.00 ms |
| Checking permissions | 0.07 ms |
| Closing tables | 0.01 ms |
| Executing | 0.00 ms |
| Sending data | 0.04 ms |
| End of update loop | 0.00 ms |
| Query end | 0.00 ms |
| Commit | 0.00 ms |
| Closing tables | 0.00 ms |
| Removing tmp table | 0.03 ms |
| Closing tables | 0.00 ms |
| Unlocking tables | 0.00 ms |
| Closing tables | 0.00 ms |
| Starting cleanup | 0.00 ms |
| Freeing items | 0.00 ms |
| Updating status | 0.01 ms |
| Reset for next command | 0.00 ms |
| # | Aufrufer | Datei und Zeilennummer | | 22 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1689 |
| 21 | JDatabaseDriver->loadObjectList() | JROOT/libraries/joomla/database/driver/mysqli.php:440 |
| 20 | JDatabaseDriverMysqli->getTableColumns() | JROOT/libraries/joomla/table/table.php:241 |
| 19 | JTable->getFields() | JROOT/libraries/joomla/table/table.php:162 |
| 18 | JTable->__construct() | JROOT/libraries/legacy/table/content.php:31 |
| 17 | JTableContent->__construct() | JROOT/libraries/joomla/table/table.php:308 |
| 16 | JTable::getInstance() | JROOT/plugins/content/myshariff/myshariff.php:128 |
| 15 | plgContentMyShariff->getShariffHTML() | JROOT/plugins/content/myshariff/myshariff.php:200 |
| 14 | plgContentMyShariff->getShariffTag() | JROOT/plugins/content/myshariff/myshariff.php:381 |
| 13 | plgContentMyShariff->onContentPrepare() | JROOT/libraries/joomla/event/event.php:69 |
| 12 | JEvent->update() | JROOT/libraries/joomla/event/dispatcher.php:159 |
| 11 | JEventDispatcher->trigger() | JROOT/components/com_content/views/category/view.html.php:106 |
| 10 | ContentViewCategory->display() | JROOT/libraries/legacy/controller/legacy.php:664 |
| 9 | JControllerLegacy->display() | JROOT/components/com_content/controller.php:113 |
| 8 | ContentController->display() | JROOT/libraries/legacy/controller/legacy.php:702 |
| 7 | JControllerLegacy->execute() | JROOT/components/com_content/content.php:38 |
| 6 | require_once JROOT/components/com_content/content.php | JROOT/libraries/cms/component/helper.php:405 |
| 5 | JComponentHelper::executeComponent() | JROOT/libraries/cms/component/helper.php:380 |
| 4 | JComponentHelper::renderComponent() | JROOT/libraries/cms/application/site.php:191 |
| 3 | JApplicationSite->dispatch() | JROOT/libraries/cms/application/site.php:230 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 0.81 ms Nach letzter Abfrage: 1.52 ms Abfragespeichernutzung: 0.028 MB Speichernutzung vor Abfrage: 7.185 MB Zeilen zurückgegeben: 0
SELECT t.*
FROM adqlu_seoglossary t
LEFT JOIN adqlu_seoglossaries g
ON t.catid = g.id
WHERE t.state = 1
AND g.state = 1
AND ( LOWER('ZKW Otterbein erhält CSC-Zertifikat in „Silber“\nDie Zement- und Kalkwerke (ZKW) OTTERBEIN wurden mit dem international renommierten CSC-Zertifikat („Concrete Sustainability Council“) in Silber ausgezeichnet.\nGroßenlüder-Müs, 6.12.2024. Die erfolgreiche Zertifizierung mit dem CSC-Zertifikat in Silber würdigt das besondere Engagement des Unternehmens für ressourcenschonendes, umweltbewusstes und nachhaltiges Handeln und ist ein bedeutender Meilenstein in der Unternehmensgeschichte. Das Familienunternehmen verpflichtet sich mittlerweile in der fünften Generation einer nachhaltigen Unternehmenspolitik und fühlt sich damit in seinem Kurs bestätigt.\n„Wir freuen uns sehr über diese großartige Auszeichnung, die unsere Arbeit belohnt und unser Engagement für Nachhaltigkeit sichtbar macht. Zugleich ist sie für uns von großer Bedeutung, um unsere Kunden bei Bauvorhaben mit stetig steigenden Anforderungen an die Nachhaltigkeit mit unseren Zementen optimal unterstützen zu können“, so OTTERBEIN-Geschäftsführer Dr. Christian W. Müller.\nFür die Zertifizierung wurde die Erfüllung einer Vielzahl strenger Kriterien in den Bereichen Umwelt, Soziales, Management und Ökonomie geprüft. Die Auszeichnung bestätigt, dass OTTERBEIN diese Standards in besonders hohem Maße erfolgreich erfüllt und die Zemente aus Müs einen wichtigen Beitrag für nachhaltige Lösungen in der Bauwirtschaft leisten.\n__________________________________\nWeitere Informationen zum CSC finden Sie hier.\nWeitere Informationen zu den OTTERBEIN-Zementen finden Sie hier.\n') LIKE CONCAT('%', LOWER(t.tterm), '%') OR 'ZKW Otterbein erhält CSC-Zertifikat in „Silber“\nDie Zement- und Kalkwerke (ZKW) OTTERBEIN wurden mit dem international renommierten CSC-Zertifikat („Concrete Sustainability Council“) in Silber ausgezeichnet.\nGroßenlüder-Müs, 6.12.2024. Die erfolgreiche Zertifizierung mit dem CSC-Zertifikat in Silber würdigt das besondere Engagement des Unternehmens für ressourcenschonendes, umweltbewusstes und nachhaltiges Handeln und ist ein bedeutender Meilenstein in der Unternehmensgeschichte. Das Familienunternehmen verpflichtet sich mittlerweile in der fünften Generation einer nachhaltigen Unternehmenspolitik und fühlt sich damit in seinem Kurs bestätigt.\n„Wir freuen uns sehr über diese großartige Auszeichnung, die unsere Arbeit belohnt und unser Engagement für Nachhaltigkeit sichtbar macht. Zugleich ist sie für uns von großer Bedeutung, um unsere Kunden bei Bauvorhaben mit stetig steigenden Anforderungen an die Nachhaltigkeit mit unseren Zementen optimal unterstützen zu können“, so OTTERBEIN-Geschäftsführer Dr. Christian W. Müller.\nFür die Zertifizierung wurde die Erfüllung einer Vielzahl strenger Kriterien in den Bereichen Umwelt, Soziales, Management und Ökonomie geprüft. Die Auszeichnung bestätigt, dass OTTERBEIN diese Standards in besonders hohem Maße erfolgreich erfüllt und die Zemente aus Müs einen wichtigen Beitrag für nachhaltige Lösungen in der Bauwirtschaft leisten.\n__________________________________\nWeitere Informationen zum CSC finden Sie hier.\nWeitere Informationen zu den OTTERBEIN-Zementen finden Sie hier.\n' REGEXP REPLACE(REPLACE(tsynonyms, ', ', '|'), ',', '|') )
AND ( g.language LIKE 'de-DE' OR g.language = '*' )
ORDER BY ordering;
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | g | ALL | PRIMARY | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 2 | Using where; Using temporary; filesort wurde genutzt |
| 1 | SIMPLE | t | ALL | NULL | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 9 | Using where; Using join buffer (flat, BNL join) |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.07 ms |
| Checking permissions | 0.00 ms |
| Opening tables | 0.01 ms |
| After opening tables | 0.00 ms |
| System lock | 0.00 ms |
| Table lock | 0.00 ms |
| Waiting for query cache lock | 0.02 ms |
| Init | 0.03 ms |
| Optimizing | 0.02 ms |
| Statistics | 0.01 ms |
| Preparing | 0.01 ms |
| Creating tmp table | 0.02 ms |
| Sorting result | 0.01 ms |
| Executing | 0.00 ms |
| Sending data | 0.42 ms |
| Creating sort index | 0.01 ms |
| Removing tmp table | 0.02 ms |
| Creating sort index | 0.01 ms |
| End of update loop | 0.00 ms |
| Query end | 0.00 ms |
| Commit | 0.00 ms |
| Closing tables | 0.00 ms |
| Unlocking tables | 0.00 ms |
| Closing tables | 0.01 ms |
| Starting cleanup | 0.00 ms |
| Freeing items | 0.01 ms |
| Updating status | 0.00 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.00 ms |
| Storing result in query cache | 0.00 ms |
| Reset for next command | 0.00 ms |
| # | Aufrufer | Datei und Zeilennummer | | 15 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1689 |
| 14 | JDatabaseDriver->loadObjectList() | JROOT/plugins/content/seoglossary/seoglossary.php:263 |
| 13 | plgContentSeoglossary->onContentPrepare() | JROOT/libraries/joomla/event/event.php:69 |
| 12 | JEvent->update() | JROOT/libraries/joomla/event/dispatcher.php:159 |
| 11 | JEventDispatcher->trigger() | JROOT/components/com_content/views/category/view.html.php:106 |
| 10 | ContentViewCategory->display() | JROOT/libraries/legacy/controller/legacy.php:664 |
| 9 | JControllerLegacy->display() | JROOT/components/com_content/controller.php:113 |
| 8 | ContentController->display() | JROOT/libraries/legacy/controller/legacy.php:702 |
| 7 | JControllerLegacy->execute() | JROOT/components/com_content/content.php:38 |
| 6 | require_once JROOT/components/com_content/content.php | JROOT/libraries/cms/component/helper.php:405 |
| 5 | JComponentHelper::executeComponent() | JROOT/libraries/cms/component/helper.php:380 |
| 4 | JComponentHelper::renderComponent() | JROOT/libraries/cms/application/site.php:191 |
| 3 | JApplicationSite->dispatch() | JROOT/libraries/cms/application/site.php:230 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 1.42 ms Nach letzter Abfrage: 40.64 ms Abfragespeichernutzung: 0.028 MB Speichernutzung vor Abfrage: 7.533 MB Zeilen zurückgegeben: 0
SELECT t.*
FROM adqlu_seoglossary t
LEFT JOIN adqlu_seoglossaries g
ON t.catid = g.id
WHERE t.state = 1
AND g.state = 1
AND ( LOWER('Dankeschön für einen unvergesslichen Tag der offenen Tür!\nWir möchten uns ganz herzlich bei den rund 4.000 Besucherinnen und Besuchern bedanken, die unser 135-jähriges Jubiläum zu einem großartigen Ereignis gemacht haben. Bei strahlendem Wetter und fantastischer Stimmung haben wir am 5. Oktober gemeinsam einen unvergesslichen Tag erlebt. Die zahlreichen Glückwünsche, der positive Zuspruch und das große Interesse an unserem Unternehmen haben uns tief beeindruckt.\nEin besonderer Dank gilt auch den vielen Helferinnen und Helfern, die mit ihrem Einsatz diesen Tag möglich gemacht haben. Ohne sie wäre diese Veranstaltung nicht so erfolgreich geworden. Wir freuen uns über die großartige Unterstützung und die vielen positiven Begegnungen.\nAuf die nächsten 135 Jahre – Glück auf und vielen Dank,Ihre Zement- und Kalkwerke OTTERBEIN\n\n\n\n\n\n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n\n\n\n View the embedded image gallery online at:\n \n https://staging.zkw-otterbein.de/aktuelles-zum-nachbarschaftsdialog#sigFreeId2704c777e7\n\n\n\n\n\n') LIKE CONCAT('%', LOWER(t.tterm), '%') OR 'Dankeschön für einen unvergesslichen Tag der offenen Tür!\nWir möchten uns ganz herzlich bei den rund 4.000 Besucherinnen und Besuchern bedanken, die unser 135-jähriges Jubiläum zu einem großartigen Ereignis gemacht haben. Bei strahlendem Wetter und fantastischer Stimmung haben wir am 5. Oktober gemeinsam einen unvergesslichen Tag erlebt. Die zahlreichen Glückwünsche, der positive Zuspruch und das große Interesse an unserem Unternehmen haben uns tief beeindruckt.\nEin besonderer Dank gilt auch den vielen Helferinnen und Helfern, die mit ihrem Einsatz diesen Tag möglich gemacht haben. Ohne sie wäre diese Veranstaltung nicht so erfolgreich geworden. Wir freuen uns über die großartige Unterstützung und die vielen positiven Begegnungen.\nAuf die nächsten 135 Jahre – Glück auf und vielen Dank,Ihre Zement- und Kalkwerke OTTERBEIN\n\n\n\n\n\n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n\n\n\n View the embedded image gallery online at:\n \n https://staging.zkw-otterbein.de/aktuelles-zum-nachbarschaftsdialog#sigFreeId2704c777e7\n\n\n\n\n\n' REGEXP REPLACE(REPLACE(tsynonyms, ', ', '|'), ',', '|') )
AND ( g.language LIKE 'de-DE' OR g.language = '*' )
ORDER BY ordering;
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | g | ALL | PRIMARY | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 2 | Using where; Using temporary; filesort wurde genutzt |
| 1 | SIMPLE | t | ALL | NULL | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 9 | Using where; Using join buffer (flat, BNL join) |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.17 ms |
| Checking permissions | 0.00 ms |
| Opening tables | 0.01 ms |
| After opening tables | 0.00 ms |
| System lock | 0.00 ms |
| Table lock | 0.00 ms |
| Waiting for query cache lock | 0.07 ms |
| Init | 0.06 ms |
| Optimizing | 0.02 ms |
| Statistics | 0.01 ms |
| Preparing | 0.01 ms |
| Creating tmp table | 0.02 ms |
| Sorting result | 0.01 ms |
| Executing | 0.00 ms |
| Sending data | 0.84 ms |
| Creating sort index | 0.01 ms |
| Removing tmp table | 0.02 ms |
| Creating sort index | 0.01 ms |
| End of update loop | 0.00 ms |
| Query end | 0.00 ms |
| Commit | 0.00 ms |
| Closing tables | 0.00 ms |
| Unlocking tables | 0.00 ms |
| Closing tables | 0.01 ms |
| Starting cleanup | 0.00 ms |
| Freeing items | 0.01 ms |
| Updating status | 0.00 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.00 ms |
| Storing result in query cache | 0.00 ms |
| Reset for next command | 0.00 ms |
| # | Aufrufer | Datei und Zeilennummer | | 15 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1689 |
| 14 | JDatabaseDriver->loadObjectList() | JROOT/plugins/content/seoglossary/seoglossary.php:263 |
| 13 | plgContentSeoglossary->onContentPrepare() | JROOT/libraries/joomla/event/event.php:69 |
| 12 | JEvent->update() | JROOT/libraries/joomla/event/dispatcher.php:159 |
| 11 | JEventDispatcher->trigger() | JROOT/components/com_content/views/category/view.html.php:106 |
| 10 | ContentViewCategory->display() | JROOT/libraries/legacy/controller/legacy.php:664 |
| 9 | JControllerLegacy->display() | JROOT/components/com_content/controller.php:113 |
| 8 | ContentController->display() | JROOT/libraries/legacy/controller/legacy.php:702 |
| 7 | JControllerLegacy->execute() | JROOT/components/com_content/content.php:38 |
| 6 | require_once JROOT/components/com_content/content.php | JROOT/libraries/cms/component/helper.php:405 |
| 5 | JComponentHelper::executeComponent() | JROOT/libraries/cms/component/helper.php:380 |
| 4 | JComponentHelper::renderComponent() | JROOT/libraries/cms/application/site.php:191 |
| 3 | JApplicationSite->dispatch() | JROOT/libraries/cms/application/site.php:230 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 1.26 ms Nach letzter Abfrage: 2.29 ms Abfragespeichernutzung: 0.028 MB Speichernutzung vor Abfrage: 7.552 MB Zeilen zurückgegeben: 0
SELECT t.*
FROM adqlu_seoglossary t
LEFT JOIN adqlu_seoglossaries g
ON t.catid = g.id
WHERE t.state = 1
AND g.state = 1
AND ( LOWER('135 Jahre Zement- und Kalkwerke OTTERBEIN\nTraditionsunternehmen feiert Jubiläum mit „Tag der offenen Tür“\n[Müs, 17.9.2024] Die Zement- und Kalkwerke (ZKW) OTTERBEIN feiern ihr 135-jähriges Firmenjubiläum. Ein bedeutender Meilenstein für das traditionsreiche Familienunternehmen aus Großenlüder-Müs, das mittlerweile in der fünften Generation geführt wird. Seit der Gründung im Jahr 1889 durch Georg Otterbein, der mehrere kleine Kalkbrennereien vereinte, hat sich das Unternehmen zu einem führenden Anbieter von Zement, Kalk sowie Putz und Mörtel entwickelt. Mit seinem breiten Produktsortiment deckt OTTERBEIN eine Vielzahl von Anwendungsfeldern ab, die von der Bau- und Baustoffbranche, der Denkmalpflege über die Landwirtschaft bis hin zum Umweltschutz reichen.\nWesentliche Meilensteine in der Firmengeschichte beinhalten den kontinuierlichen Ausbau der Produktionsanlagen und deren Weiterentwicklung, die stetige Ausrichtung des Produktportfolios an den Kundenbedarfen und der Fokus auf eine nachhaltige Entwicklung, die ökologische und soziale Verantwortung mit wirtschaftlicher Leistungsfähigkeit vereint. Die Sicherung der Rohstoffversorgung spielt dabei eine zentrale Rolle für die Wertschöpfung des Unternehmens. „Der Zugang zu Kalkstein ist die Grundlage für die Herstellung unserer Produkte. Dies ist seit nunmehr 135 Jahren ein Garant für unsere Veredelung des Rohstoffs für den Bedarf in unserer Region, für kurze Wege zwischen Produzent und Verbraucher im Sinne des Klimaschutzes und für eine Vielzahl von Arbeitsplätzen bei uns und unseren Partnern“, betont der geschäftsführende Gesellschafter Winfried Müller.\nHeute sieht sich OTTERBEIN den branchenweiten Herausforderungen der Zement- und Kalkindustrie gegenüber, die insbesondere durch einen hohen Wettbewerbsdruck, steigende Energiekosten und enorme Anstrengungen für die Dekarbonisierung der Produktionsprozesse gekennzeichnet sind. Durch umfangreiche Investitionen in moderne Technologien und umweltfreundliche Produktionsmethoden sowie einem starken Fokus auf Qualität und Nachhaltigkeit hat OTTERBEIN frühzeitig die Weichen für die Zukunft gestellt und blickt optimistisch nach vorne. „Wir werden auch in den nächsten Jahrzehnten ein verlässlicher Partner für unsere Kunden sein und weiterhin auf Innovationen setzen, um unsere Stellung im Markt auszubauen“, unterstreicht Geschäftsführer Dr. Christian W. Müller.\nEin besonderer Dank gilt den rund 130 Mitarbeitern, die maßgeblich zum Erfolg des Unternehmens beitragen. „Ohne das Engagement und die Loyalität unserer Mitarbeiter wären die Erfolge der vergangenen Jahrzehnte nicht möglich gewesen. Sie sind das Rückgrat unseres Unternehmens“, so die Geschäftsführer.\nDas Unternehmen feiert sein Jubiläum am 5. Oktober 2024 mit einem „Tag der offenen Tür“. Die Besucher erwartet ein abwechslungsreiches Programm: neben Führungen durch das Werk und zum angrenzenden Steinbruch, Produktvorführungen und Einblicke in das vielfältige Produktprogramm, einer Mineralien- und Fossilienausstellung sowie einem bunten Kinderprogramm, werden den Besuchern die vielfältigen neuen Entwicklungen und innovativen Anlageninvestitionen vorgestellt. Das Unternehmen freut sich darauf, seine 135-jährige Geschichte Revue passieren zu lassen und einen Blick hinter die Kulissen zu gewähren.\n\n\n\n\n\n \n \n \n \n \n \n \n \n \n \n \n\n\n\n View the embedded image gallery online at:\n \n https://staging.zkw-otterbein.de/aktuelles-zum-nachbarschaftsdialog#sigFreeId80dece7b68\n\n\n\n\n\n') LIKE CONCAT('%', LOWER(t.tterm), '%') OR '135 Jahre Zement- und Kalkwerke OTTERBEIN\nTraditionsunternehmen feiert Jubiläum mit „Tag der offenen Tür“\n[Müs, 17.9.2024] Die Zement- und Kalkwerke (ZKW) OTTERBEIN feiern ihr 135-jähriges Firmenjubiläum. Ein bedeutender Meilenstein für das traditionsreiche Familienunternehmen aus Großenlüder-Müs, das mittlerweile in der fünften Generation geführt wird. Seit der Gründung im Jahr 1889 durch Georg Otterbein, der mehrere kleine Kalkbrennereien vereinte, hat sich das Unternehmen zu einem führenden Anbieter von Zement, Kalk sowie Putz und Mörtel entwickelt. Mit seinem breiten Produktsortiment deckt OTTERBEIN eine Vielzahl von Anwendungsfeldern ab, die von der Bau- und Baustoffbranche, der Denkmalpflege über die Landwirtschaft bis hin zum Umweltschutz reichen.\nWesentliche Meilensteine in der Firmengeschichte beinhalten den kontinuierlichen Ausbau der Produktionsanlagen und deren Weiterentwicklung, die stetige Ausrichtung des Produktportfolios an den Kundenbedarfen und der Fokus auf eine nachhaltige Entwicklung, die ökologische und soziale Verantwortung mit wirtschaftlicher Leistungsfähigkeit vereint. Die Sicherung der Rohstoffversorgung spielt dabei eine zentrale Rolle für die Wertschöpfung des Unternehmens. „Der Zugang zu Kalkstein ist die Grundlage für die Herstellung unserer Produkte. Dies ist seit nunmehr 135 Jahren ein Garant für unsere Veredelung des Rohstoffs für den Bedarf in unserer Region, für kurze Wege zwischen Produzent und Verbraucher im Sinne des Klimaschutzes und für eine Vielzahl von Arbeitsplätzen bei uns und unseren Partnern“, betont der geschäftsführende Gesellschafter Winfried Müller.\nHeute sieht sich OTTERBEIN den branchenweiten Herausforderungen der Zement- und Kalkindustrie gegenüber, die insbesondere durch einen hohen Wettbewerbsdruck, steigende Energiekosten und enorme Anstrengungen für die Dekarbonisierung der Produktionsprozesse gekennzeichnet sind. Durch umfangreiche Investitionen in moderne Technologien und umweltfreundliche Produktionsmethoden sowie einem starken Fokus auf Qualität und Nachhaltigkeit hat OTTERBEIN frühzeitig die Weichen für die Zukunft gestellt und blickt optimistisch nach vorne. „Wir werden auch in den nächsten Jahrzehnten ein verlässlicher Partner für unsere Kunden sein und weiterhin auf Innovationen setzen, um unsere Stellung im Markt auszubauen“, unterstreicht Geschäftsführer Dr. Christian W. Müller.\nEin besonderer Dank gilt den rund 130 Mitarbeitern, die maßgeblich zum Erfolg des Unternehmens beitragen. „Ohne das Engagement und die Loyalität unserer Mitarbeiter wären die Erfolge der vergangenen Jahrzehnte nicht möglich gewesen. Sie sind das Rückgrat unseres Unternehmens“, so die Geschäftsführer.\nDas Unternehmen feiert sein Jubiläum am 5. Oktober 2024 mit einem „Tag der offenen Tür“. Die Besucher erwartet ein abwechslungsreiches Programm: neben Führungen durch das Werk und zum angrenzenden Steinbruch, Produktvorführungen und Einblicke in das vielfältige Produktprogramm, einer Mineralien- und Fossilienausstellung sowie einem bunten Kinderprogramm, werden den Besuchern die vielfältigen neuen Entwicklungen und innovativen Anlageninvestitionen vorgestellt. Das Unternehmen freut sich darauf, seine 135-jährige Geschichte Revue passieren zu lassen und einen Blick hinter die Kulissen zu gewähren.\n\n\n\n\n\n \n \n \n \n \n \n \n \n \n \n \n\n\n\n View the embedded image gallery online at:\n \n https://staging.zkw-otterbein.de/aktuelles-zum-nachbarschaftsdialog#sigFreeId80dece7b68\n\n\n\n\n\n' REGEXP REPLACE(REPLACE(tsynonyms, ', ', '|'), ',', '|') )
AND ( g.language LIKE 'de-DE' OR g.language = '*' )
ORDER BY ordering;
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | g | ALL | PRIMARY | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 2 | Using where; Using temporary; filesort wurde genutzt |
| 1 | SIMPLE | t | ALL | NULL | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 9 | Using where; Using join buffer (flat, BNL join) |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.01 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.14 ms |
| Checking permissions | 0.00 ms |
| Opening tables | 0.01 ms |
| After opening tables | 0.00 ms |
| System lock | 0.00 ms |
| Table lock | 0.00 ms |
| Waiting for query cache lock | 0.03 ms |
| Init | 0.05 ms |
| Optimizing | 0.02 ms |
| Statistics | 0.01 ms |
| Preparing | 0.01 ms |
| Creating tmp table | 0.02 ms |
| Sorting result | 0.01 ms |
| Executing | 0.00 ms |
| Sending data | 0.77 ms |
| Creating sort index | 0.01 ms |
| Removing tmp table | 0.02 ms |
| Creating sort index | 0.00 ms |
| End of update loop | 0.00 ms |
| Query end | 0.00 ms |
| Commit | 0.00 ms |
| Closing tables | 0.00 ms |
| Unlocking tables | 0.00 ms |
| Closing tables | 0.01 ms |
| Starting cleanup | 0.00 ms |
| Freeing items | 0.01 ms |
| Updating status | 0.00 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.00 ms |
| Storing result in query cache | 0.00 ms |
| Reset for next command | 0.00 ms |
| # | Aufrufer | Datei und Zeilennummer | | 15 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1689 |
| 14 | JDatabaseDriver->loadObjectList() | JROOT/plugins/content/seoglossary/seoglossary.php:263 |
| 13 | plgContentSeoglossary->onContentPrepare() | JROOT/libraries/joomla/event/event.php:69 |
| 12 | JEvent->update() | JROOT/libraries/joomla/event/dispatcher.php:159 |
| 11 | JEventDispatcher->trigger() | JROOT/components/com_content/views/category/view.html.php:106 |
| 10 | ContentViewCategory->display() | JROOT/libraries/legacy/controller/legacy.php:664 |
| 9 | JControllerLegacy->display() | JROOT/components/com_content/controller.php:113 |
| 8 | ContentController->display() | JROOT/libraries/legacy/controller/legacy.php:702 |
| 7 | JControllerLegacy->execute() | JROOT/components/com_content/content.php:38 |
| 6 | require_once JROOT/components/com_content/content.php | JROOT/libraries/cms/component/helper.php:405 |
| 5 | JComponentHelper::executeComponent() | JROOT/libraries/cms/component/helper.php:380 |
| 4 | JComponentHelper::renderComponent() | JROOT/libraries/cms/application/site.php:191 |
| 3 | JApplicationSite->dispatch() | JROOT/libraries/cms/application/site.php:230 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 0.88 ms Nach letzter Abfrage: 0.63 ms Abfragespeichernutzung: 0.028 MB Speichernutzung vor Abfrage: 7.566 MB Zeilen zurückgegeben: 0
SELECT t.*
FROM adqlu_seoglossary t
LEFT JOIN adqlu_seoglossaries g
ON t.catid = g.id
WHERE t.state = 1
AND g.state = 1
AND ( LOWER('Faszinierende Fossiliensuche: Kinder auf Entdeckungsreise im Steinbruch von ZKW OTTERBEIN\n[Müs, 13.8.2024] Die Suche nach seltenen Fossilien und Mineralien ist ein spannendes Erlebnis, das auch in diesem Jahr wieder zahlreiche Kinder begeisterte. Das Sommerferienprogramm 2024 der Gemeinde Großenlüder bot mit der „Exkursion in die Urzeit – Mineralien und Fossilien“ ein Highlight, das schnell ausgebucht war.\nAnfang August war es soweit – rund 30 Kinder im Alter von 6 bis 14 Jahren brachen zu einer spannenden Reise in die Erdgeschichte auf. Gut ausgerüstet mit Schutzkleidung, Hammer und Meißel, machten sich die Kinder im Steinbruch der ZKW OTTERBEIN auf die Suche nach seltenen Fossilien sowie funkelnden Kristallen.\nUnter fachkundiger Anleitung von Manfred Schulz und weiteren Experten vom Arbeitskreis Geologie/Paläontologie des Vereins für Naturkunde Osthessen (VNO), Mitgliedern des Heimat- und Geschichtsverein Großenlüder sowie Laborleiterin Birte Rowold und Betriebsratsvorsitzende Nicole Rößler von ZKW OTTERBEIN erhielten die jungen Forscher interessante Hintergrundinformationen zur Entstehung von Kalkstein, Fossilien und Mineralien. Die Freude war riesig, als die ersten Funde gemacht wurden, und jedes Kind war stolz auf seine Entdeckungen.\nNach einer wohlverdienten Stärkung in der Werkskantine der ZKW OTTERBEIN, konnten die Kinder ihre gesammelten Schätze mit nach Hause nehmen. Das Organisationsteam war mit der Veranstaltung erneut hochzufrieden: „Es war wunderbar mitzuerleben, wie begeistert die Kinder auch in diesem Jahr bei der Sache waren. Sie stellten zahlreiche Fragen und zeigten großes Interesse. Die tolle Stimmung während der Exkursion hat uns sehr erfreut.\"\nFür diejenigen, die in diesem Jahr keinen Platz ergattern konnten, gibt es gute Nachrichten: Angesichts des großen Erfolgs und der positiven Rückmeldungen planen die Veranstalter, die aufregende Exkursion auch im nächsten Jahr wieder anzubieten.\n') LIKE CONCAT('%', LOWER(t.tterm), '%') OR 'Faszinierende Fossiliensuche: Kinder auf Entdeckungsreise im Steinbruch von ZKW OTTERBEIN\n[Müs, 13.8.2024] Die Suche nach seltenen Fossilien und Mineralien ist ein spannendes Erlebnis, das auch in diesem Jahr wieder zahlreiche Kinder begeisterte. Das Sommerferienprogramm 2024 der Gemeinde Großenlüder bot mit der „Exkursion in die Urzeit – Mineralien und Fossilien“ ein Highlight, das schnell ausgebucht war.\nAnfang August war es soweit – rund 30 Kinder im Alter von 6 bis 14 Jahren brachen zu einer spannenden Reise in die Erdgeschichte auf. Gut ausgerüstet mit Schutzkleidung, Hammer und Meißel, machten sich die Kinder im Steinbruch der ZKW OTTERBEIN auf die Suche nach seltenen Fossilien sowie funkelnden Kristallen.\nUnter fachkundiger Anleitung von Manfred Schulz und weiteren Experten vom Arbeitskreis Geologie/Paläontologie des Vereins für Naturkunde Osthessen (VNO), Mitgliedern des Heimat- und Geschichtsverein Großenlüder sowie Laborleiterin Birte Rowold und Betriebsratsvorsitzende Nicole Rößler von ZKW OTTERBEIN erhielten die jungen Forscher interessante Hintergrundinformationen zur Entstehung von Kalkstein, Fossilien und Mineralien. Die Freude war riesig, als die ersten Funde gemacht wurden, und jedes Kind war stolz auf seine Entdeckungen.\nNach einer wohlverdienten Stärkung in der Werkskantine der ZKW OTTERBEIN, konnten die Kinder ihre gesammelten Schätze mit nach Hause nehmen. Das Organisationsteam war mit der Veranstaltung erneut hochzufrieden: „Es war wunderbar mitzuerleben, wie begeistert die Kinder auch in diesem Jahr bei der Sache waren. Sie stellten zahlreiche Fragen und zeigten großes Interesse. Die tolle Stimmung während der Exkursion hat uns sehr erfreut.\"\nFür diejenigen, die in diesem Jahr keinen Platz ergattern konnten, gibt es gute Nachrichten: Angesichts des großen Erfolgs und der positiven Rückmeldungen planen die Veranstalter, die aufregende Exkursion auch im nächsten Jahr wieder anzubieten.\n' REGEXP REPLACE(REPLACE(tsynonyms, ', ', '|'), ',', '|') )
AND ( g.language LIKE 'de-DE' OR g.language = '*' )
ORDER BY ordering;
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | g | ALL | PRIMARY | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 2 | Using where; Using temporary; filesort wurde genutzt |
| 1 | SIMPLE | t | ALL | NULL | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 9 | Using where; Using join buffer (flat, BNL join) |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.08 ms |
| Checking permissions | 0.00 ms |
| Opening tables | 0.01 ms |
| After opening tables | 0.00 ms |
| System lock | 0.00 ms |
| Table lock | 0.00 ms |
| Waiting for query cache lock | 0.02 ms |
| Init | 0.04 ms |
| Optimizing | 0.02 ms |
| Statistics | 0.01 ms |
| Preparing | 0.01 ms |
| Creating tmp table | 0.02 ms |
| Sorting result | 0.01 ms |
| Executing | 0.00 ms |
| Sending data | 0.49 ms |
| Creating sort index | 0.01 ms |
| Removing tmp table | 0.02 ms |
| Creating sort index | 0.01 ms |
| End of update loop | 0.00 ms |
| Query end | 0.00 ms |
| Commit | 0.00 ms |
| Closing tables | 0.00 ms |
| Unlocking tables | 0.00 ms |
| Closing tables | 0.01 ms |
| Starting cleanup | 0.00 ms |
| Freeing items | 0.01 ms |
| Updating status | 0.00 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.00 ms |
| Storing result in query cache | 0.00 ms |
| Reset for next command | 0.00 ms |
| # | Aufrufer | Datei und Zeilennummer | | 15 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1689 |
| 14 | JDatabaseDriver->loadObjectList() | JROOT/plugins/content/seoglossary/seoglossary.php:263 |
| 13 | plgContentSeoglossary->onContentPrepare() | JROOT/libraries/joomla/event/event.php:69 |
| 12 | JEvent->update() | JROOT/libraries/joomla/event/dispatcher.php:159 |
| 11 | JEventDispatcher->trigger() | JROOT/components/com_content/views/category/view.html.php:106 |
| 10 | ContentViewCategory->display() | JROOT/libraries/legacy/controller/legacy.php:664 |
| 9 | JControllerLegacy->display() | JROOT/components/com_content/controller.php:113 |
| 8 | ContentController->display() | JROOT/libraries/legacy/controller/legacy.php:702 |
| 7 | JControllerLegacy->execute() | JROOT/components/com_content/content.php:38 |
| 6 | require_once JROOT/components/com_content/content.php | JROOT/libraries/cms/component/helper.php:405 |
| 5 | JComponentHelper::executeComponent() | JROOT/libraries/cms/component/helper.php:380 |
| 4 | JComponentHelper::renderComponent() | JROOT/libraries/cms/application/site.php:191 |
| 3 | JApplicationSite->dispatch() | JROOT/libraries/cms/application/site.php:230 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 0.69 ms Nach letzter Abfrage: 0.59 ms Abfragespeichernutzung: 0.028 MB Speichernutzung vor Abfrage: 7.574 MB Zeilen zurückgegeben: 0
SELECT t.*
FROM adqlu_seoglossary t
LEFT JOIN adqlu_seoglossaries g
ON t.catid = g.id
WHERE t.state = 1
AND g.state = 1
AND ( LOWER('ZKW OTTERBEIN spendet für die Kirche in Müs\n[Müs, 9.7.2024] ZKW OTTERBEIN hat in feierlichem Rahmen eine Spende von 2.500 Euro an Herrn Pfarrer Joachim Hartel für die Sanierung der historischen Kirchturmuhr der katholischen Kirche in Müs übergeben.\nWir freuen uns, mit dieser Spende einen Beitrag zum Erhalt eines wichtigen Kulturguts leisten und die Kirchengemeinde in Müs unterstützen zu können. Die Kirchturmuhr ist nicht nur ein bedeutendes Wahrzeichen, sondern auch ein Symbol für die Geschichte und Tradition unseres Ortes.\nNeben unserer Spende hat auch die Jagdgenossenschaft Müs eine großzügige Spende von 2.500 Euro beigesteuert. Darüber hinaus haben viele ehrenamtliche Helfer sowie ortsansässige Firmen die Arbeiten tatkräftig unterstützt.\nDie Sanierungsmaßnahmen umfassten u.a. ein neues Uhrwerk sowie die fachgerechte Sanierung des Ziffernblatts. Wir sind stolz darauf, Teil dieser wertvollen Initiative zu sein und hoffen, dass die restaurierte Kirchturmuhr viele weitere Jahre den Takt des Lebens in Müs angeben wird.\n') LIKE CONCAT('%', LOWER(t.tterm), '%') OR 'ZKW OTTERBEIN spendet für die Kirche in Müs\n[Müs, 9.7.2024] ZKW OTTERBEIN hat in feierlichem Rahmen eine Spende von 2.500 Euro an Herrn Pfarrer Joachim Hartel für die Sanierung der historischen Kirchturmuhr der katholischen Kirche in Müs übergeben.\nWir freuen uns, mit dieser Spende einen Beitrag zum Erhalt eines wichtigen Kulturguts leisten und die Kirchengemeinde in Müs unterstützen zu können. Die Kirchturmuhr ist nicht nur ein bedeutendes Wahrzeichen, sondern auch ein Symbol für die Geschichte und Tradition unseres Ortes.\nNeben unserer Spende hat auch die Jagdgenossenschaft Müs eine großzügige Spende von 2.500 Euro beigesteuert. Darüber hinaus haben viele ehrenamtliche Helfer sowie ortsansässige Firmen die Arbeiten tatkräftig unterstützt.\nDie Sanierungsmaßnahmen umfassten u.a. ein neues Uhrwerk sowie die fachgerechte Sanierung des Ziffernblatts. Wir sind stolz darauf, Teil dieser wertvollen Initiative zu sein und hoffen, dass die restaurierte Kirchturmuhr viele weitere Jahre den Takt des Lebens in Müs angeben wird.\n' REGEXP REPLACE(REPLACE(tsynonyms, ', ', '|'), ',', '|') )
AND ( g.language LIKE 'de-DE' OR g.language = '*' )
ORDER BY ordering;
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | g | ALL | PRIMARY | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 2 | Using where; Using temporary; filesort wurde genutzt |
| 1 | SIMPLE | t | ALL | NULL | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 9 | Using where; Using join buffer (flat, BNL join) |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.06 ms |
| Checking permissions | 0.00 ms |
| Opening tables | 0.01 ms |
| After opening tables | 0.01 ms |
| System lock | 0.00 ms |
| Table lock | 0.00 ms |
| Waiting for query cache lock | 0.01 ms |
| Init | 0.03 ms |
| Optimizing | 0.02 ms |
| Statistics | 0.01 ms |
| Preparing | 0.01 ms |
| Creating tmp table | 0.02 ms |
| Sorting result | 0.01 ms |
| Executing | 0.00 ms |
| Sending data | 0.33 ms |
| Creating sort index | 0.01 ms |
| Removing tmp table | 0.02 ms |
| Creating sort index | 0.00 ms |
| End of update loop | 0.00 ms |
| Query end | 0.00 ms |
| Commit | 0.00 ms |
| Closing tables | 0.00 ms |
| Unlocking tables | 0.00 ms |
| Closing tables | 0.01 ms |
| Starting cleanup | 0.00 ms |
| Freeing items | 0.01 ms |
| Updating status | 0.00 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.01 ms |
| Waiting for query cache lock | 0.02 ms |
| Updating status | 0.00 ms |
| Storing result in query cache | 0.03 ms |
| Reset for next command | 0.01 ms |
| # | Aufrufer | Datei und Zeilennummer | | 15 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1689 |
| 14 | JDatabaseDriver->loadObjectList() | JROOT/plugins/content/seoglossary/seoglossary.php:263 |
| 13 | plgContentSeoglossary->onContentPrepare() | JROOT/libraries/joomla/event/event.php:69 |
| 12 | JEvent->update() | JROOT/libraries/joomla/event/dispatcher.php:159 |
| 11 | JEventDispatcher->trigger() | JROOT/components/com_content/views/category/view.html.php:106 |
| 10 | ContentViewCategory->display() | JROOT/libraries/legacy/controller/legacy.php:664 |
| 9 | JControllerLegacy->display() | JROOT/components/com_content/controller.php:113 |
| 8 | ContentController->display() | JROOT/libraries/legacy/controller/legacy.php:702 |
| 7 | JControllerLegacy->execute() | JROOT/components/com_content/content.php:38 |
| 6 | require_once JROOT/components/com_content/content.php | JROOT/libraries/cms/component/helper.php:405 |
| 5 | JComponentHelper::executeComponent() | JROOT/libraries/cms/component/helper.php:380 |
| 4 | JComponentHelper::renderComponent() | JROOT/libraries/cms/application/site.php:191 |
| 3 | JApplicationSite->dispatch() | JROOT/libraries/cms/application/site.php:230 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 0.83 ms Nach letzter Abfrage: 0.62 ms Abfragespeichernutzung: 0.028 MB Speichernutzung vor Abfrage: 7.593 MB Zeilen zurückgegeben: 0
SELECT t.*
FROM adqlu_seoglossary t
LEFT JOIN adqlu_seoglossaries g
ON t.catid = g.id
WHERE t.state = 1
AND g.state = 1
AND ( LOWER('Zukunftsorientierte Investition:\nZKW OTTERBEIN setzt auf nachhaltige Produktivität und Mitarbeiterkomfort\n[Müs, 2.5.2024] Die Zement- und Kalkwerke (ZKW) OTTERBEIN haben kürzlich in die Erweiterung ihrer Fahrzeugflotte für den Steinbruchbetrieb investiert. Zwei beeindruckende neue Großfahrzeuge wurden feierlich in den Fuhrpark aufgenommen: ein Dumper der Marke Bell und ein Radlader von Liebherr.\nDer Bell Dumper B45E ist ein robuster und wendiger Dumper, der für seine Zuverlässigkeit und Effizienz bekannt ist. Sagenhafte 41 Tonnen Material lassen sich mit dem Gerät transportieren. Sein ergonomisches Design sorgt für einen komfortablen Arbeitsplatz für die Mitarbeiter. Ebenso wurde ein neuer Liebherr L566 Xpower angeschafft - ein leistungsstarker Radlader, der bei OTTERBEIN 24/7 im Dreischichtbetrieb zum Einsatz kommt. Seine hohe Qualität und der geringe Treibstoffverbrauch, der durch den innovativen XPower Fahrantrieb begründet ist, tragen zu höchster Effizienz und einer kontinuierlichen Betriebsbereitschaft bei.\n\"Die neuen Fahrzeuge spielen in unserem Nachhaltigkeitskonzept für den Steinbruchbetrieb eine wichtige Rolle: sie werden nicht nur die Produktivität erhöhen und die Effizienz der betrieblichen Abläufe steigern, sondern unseren Mitarbeitern einen modernen, attraktiven und komfortablen Arbeitsplatz bieten. Daneben hilft der geringe Treibstoffverbrauch CO2 zu sparen. Ebenso arbeiten die Fahrzeuge äußerst geräuscharm\", freut sich Bernhard Pfohl, Leiter des OTTERBEIN-Steinbruchbetriebs.\nBildunterschrift: Freuen sich über die neuen Steinbruchmaschinen (v. rechts): Bernhard Pfohl (Leiter Steinbruchbetrieb), Dr. Christian W. Müller (Geschäftsführer), Marc Sesselmann (Leiter Produktion & Technik).\n') LIKE CONCAT('%', LOWER(t.tterm), '%') OR 'Zukunftsorientierte Investition:\nZKW OTTERBEIN setzt auf nachhaltige Produktivität und Mitarbeiterkomfort\n[Müs, 2.5.2024] Die Zement- und Kalkwerke (ZKW) OTTERBEIN haben kürzlich in die Erweiterung ihrer Fahrzeugflotte für den Steinbruchbetrieb investiert. Zwei beeindruckende neue Großfahrzeuge wurden feierlich in den Fuhrpark aufgenommen: ein Dumper der Marke Bell und ein Radlader von Liebherr.\nDer Bell Dumper B45E ist ein robuster und wendiger Dumper, der für seine Zuverlässigkeit und Effizienz bekannt ist. Sagenhafte 41 Tonnen Material lassen sich mit dem Gerät transportieren. Sein ergonomisches Design sorgt für einen komfortablen Arbeitsplatz für die Mitarbeiter. Ebenso wurde ein neuer Liebherr L566 Xpower angeschafft - ein leistungsstarker Radlader, der bei OTTERBEIN 24/7 im Dreischichtbetrieb zum Einsatz kommt. Seine hohe Qualität und der geringe Treibstoffverbrauch, der durch den innovativen XPower Fahrantrieb begründet ist, tragen zu höchster Effizienz und einer kontinuierlichen Betriebsbereitschaft bei.\n\"Die neuen Fahrzeuge spielen in unserem Nachhaltigkeitskonzept für den Steinbruchbetrieb eine wichtige Rolle: sie werden nicht nur die Produktivität erhöhen und die Effizienz der betrieblichen Abläufe steigern, sondern unseren Mitarbeitern einen modernen, attraktiven und komfortablen Arbeitsplatz bieten. Daneben hilft der geringe Treibstoffverbrauch CO2 zu sparen. Ebenso arbeiten die Fahrzeuge äußerst geräuscharm\", freut sich Bernhard Pfohl, Leiter des OTTERBEIN-Steinbruchbetriebs.\nBildunterschrift: Freuen sich über die neuen Steinbruchmaschinen (v. rechts): Bernhard Pfohl (Leiter Steinbruchbetrieb), Dr. Christian W. Müller (Geschäftsführer), Marc Sesselmann (Leiter Produktion & Technik).\n' REGEXP REPLACE(REPLACE(tsynonyms, ', ', '|'), ',', '|') )
AND ( g.language LIKE 'de-DE' OR g.language = '*' )
ORDER BY ordering;
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | g | ALL | PRIMARY | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 2 | Using where; Using temporary; filesort wurde genutzt |
| 1 | SIMPLE | t | ALL | NULL | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 9 | Using where; Using join buffer (flat, BNL join) |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.07 ms |
| Checking permissions | 0.00 ms |
| Opening tables | 0.01 ms |
| After opening tables | 0.00 ms |
| System lock | 0.00 ms |
| Table lock | 0.00 ms |
| Waiting for query cache lock | 0.02 ms |
| Init | 0.03 ms |
| Optimizing | 0.02 ms |
| Statistics | 0.01 ms |
| Preparing | 0.01 ms |
| Creating tmp table | 0.02 ms |
| Sorting result | 0.01 ms |
| Executing | 0.00 ms |
| Sending data | 0.44 ms |
| Creating sort index | 0.01 ms |
| Removing tmp table | 0.02 ms |
| Creating sort index | 0.00 ms |
| End of update loop | 0.00 ms |
| Query end | 0.00 ms |
| Commit | 0.00 ms |
| Closing tables | 0.00 ms |
| Unlocking tables | 0.00 ms |
| Closing tables | 0.01 ms |
| Starting cleanup | 0.00 ms |
| Freeing items | 0.01 ms |
| Updating status | 0.00 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.00 ms |
| Storing result in query cache | 0.01 ms |
| Reset for next command | 0.00 ms |
| # | Aufrufer | Datei und Zeilennummer | | 15 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1689 |
| 14 | JDatabaseDriver->loadObjectList() | JROOT/plugins/content/seoglossary/seoglossary.php:263 |
| 13 | plgContentSeoglossary->onContentPrepare() | JROOT/libraries/joomla/event/event.php:69 |
| 12 | JEvent->update() | JROOT/libraries/joomla/event/dispatcher.php:159 |
| 11 | JEventDispatcher->trigger() | JROOT/components/com_content/views/category/view.html.php:106 |
| 10 | ContentViewCategory->display() | JROOT/libraries/legacy/controller/legacy.php:664 |
| 9 | JControllerLegacy->display() | JROOT/components/com_content/controller.php:113 |
| 8 | ContentController->display() | JROOT/libraries/legacy/controller/legacy.php:702 |
| 7 | JControllerLegacy->execute() | JROOT/components/com_content/content.php:38 |
| 6 | require_once JROOT/components/com_content/content.php | JROOT/libraries/cms/component/helper.php:405 |
| 5 | JComponentHelper::executeComponent() | JROOT/libraries/cms/component/helper.php:380 |
| 4 | JComponentHelper::renderComponent() | JROOT/libraries/cms/application/site.php:191 |
| 3 | JApplicationSite->dispatch() | JROOT/libraries/cms/application/site.php:230 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 1.39 ms Nach letzter Abfrage: 1253.08 ms Abfragespeichernutzung: 0.028 MB Speichernutzung vor Abfrage: 7.637 MB Zeilen zurückgegeben: 0
SELECT t.*
FROM adqlu_seoglossary t
LEFT JOIN adqlu_seoglossaries g
ON t.catid = g.id
WHERE t.state = 1
AND g.state = 1
AND ( LOWER('ZKW OTTERBEIN feiert Ofenzündung im 135-igsten Jubiläumsjahr\nDrehofen auf die Reise geschickt\nGroßenlüder-Müs. Mit Stolz und feierlichem Glanz markierten die Zement- und Kalkwerke (ZKW) OTTERBEIN in ihrem 135-igsten Jubiläumsjahr den Beginn der Saison 2024 mit der traditionellen Zündung ihres Zementdrehofens. Die Zeremonie, die den Start der sog. Ofenreise einleitet, wurde nach der alljährlichen Reparaturphase Anfang März begangen.\nIm Rahmen der sog. Winterreparatur wird die Produktion einmal im Jahr gezielt heruntergefahren, um umfangreiche Instandhaltungs- und Modernisierungsarbeiten an den Anlagen durchzuführen. So wurden in diesem Jahr u.a. rund 100 to der feuerfesten Ofensteine fachgerecht erneuert. Neben der gesamten Ofenanlage wurden auch die Roh- und Zementmühlen instandgesetzt, einer grundlegenden Revision unterzogen und fit für die neue Ofenreise gemacht. Mehr als 40 erfahrene Mitarbeiter verschiedener Gewerke waren hierfür mehr als 10 000 Stunden teils Tag und Nacht ohne jegliche Arbeitsunfälle im Einsatz.\nBegleitet mit dem Dank für das außerordentliche Engagement aller beteiligten Arbeitskräfte wurde der Ofen Anfang März im Beisein der Geschäftsführer Winfried Müller und Dr. Christian W. Müller sowie dem Werksleiter Dr. Tilman Scholten, dem Leiter Produktion und Technik Marc Sesselmann sowie dem Abteilungsleiter für die Zement- und Kalkproduktion Klaus Neumann feierlich auf die 42. Ofenreise geschickt.\n„Mit dem Wiederanfahren der Produktion ist die Versorgung unserer Kunden in der Region mit unseren erstklassigen OTTERBEIN-Zementen rechtzeitig zum Beginn der Bausaison sichergestellt. Unsere Wertschöpfung vor Ort ermöglicht kurze Wege vom Hersteller zum Verbraucher, was die schnelle Verfügbarkeit unserer hochwertigen Produkte gewährleistet und durch die geringen Transportentfernungen das Klima und die Umwelt entlastet.\", betonte Geschäftsführer Dr. Christian W. Müller.\nEin Höhepunkt der diesjährigen Produktionspause war der Austausch des sog. Trommeltrockners, eines beeindruckenden 22 Meter langen und rund 80 Tonnen schweren massiven Stahlrohrs. Die aufwendige Maßnahme markiert den letzten Baustein des innovativen Großprojektes „OTTERBEIN ZEMENT ECO-PLUS 2023“, mit dem neue Maßstäbe bei der nachhaltigen und umweltschonenden Zementproduktion gesetzt werden. Der Trommeltrockner spielt eine entscheidende Rolle im energieeffizienten Trocknungsprozess von Kalkstein mittels Ofenabwärme und wird zukünftig auch für die Trocknung von Hüttensand genutzt. Dieser innovative Schritt ist ein weiterer Meilenstein auf dem Weg zur Reduzierung des CO2-Fußabdrucks in der Zementherstellung bei ZKW OTTERBEIN.\n\"Die erfolgreiche Zündung des Zementdrehofens und der Abschluss der Winterreparatur unterstreichen unser Engagement für Nachhaltigkeit und kontinuierliche Verbesserung. Durch den Abschluss des Großprojektes „OTTERBEIN ZEMENT ECO-PLUS 2023“ startet unsere Produktionslinie für Zement als eine der ressourcen- und emissionsärmsten weltweit in die neue Saison\", freut sich Werksleiter Dr. Tilman Scholten.\nWeitere Infos zu „OTTERBEIN ZEMENT ECO-PLUS 2023“ gibt es HIER.\nBildunterschrift: Den Zementdrehofen auf die 42. Ofenreise geschickt: Klaus Neumann, Dr. Tilman Scholten, Marc Sesselmann und Dr. Christian W. Müller (v.lks.).\n\n\n\n\n\n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n\n\n\n View the embedded image gallery online at:\n \n https://staging.zkw-otterbein.de/aktuelles-zum-nachbarschaftsdialog#sigFreeIddbf587df91\n\n\n\n\n\n') LIKE CONCAT('%', LOWER(t.tterm), '%') OR 'ZKW OTTERBEIN feiert Ofenzündung im 135-igsten Jubiläumsjahr\nDrehofen auf die Reise geschickt\nGroßenlüder-Müs. Mit Stolz und feierlichem Glanz markierten die Zement- und Kalkwerke (ZKW) OTTERBEIN in ihrem 135-igsten Jubiläumsjahr den Beginn der Saison 2024 mit der traditionellen Zündung ihres Zementdrehofens. Die Zeremonie, die den Start der sog. Ofenreise einleitet, wurde nach der alljährlichen Reparaturphase Anfang März begangen.\nIm Rahmen der sog. Winterreparatur wird die Produktion einmal im Jahr gezielt heruntergefahren, um umfangreiche Instandhaltungs- und Modernisierungsarbeiten an den Anlagen durchzuführen. So wurden in diesem Jahr u.a. rund 100 to der feuerfesten Ofensteine fachgerecht erneuert. Neben der gesamten Ofenanlage wurden auch die Roh- und Zementmühlen instandgesetzt, einer grundlegenden Revision unterzogen und fit für die neue Ofenreise gemacht. Mehr als 40 erfahrene Mitarbeiter verschiedener Gewerke waren hierfür mehr als 10 000 Stunden teils Tag und Nacht ohne jegliche Arbeitsunfälle im Einsatz.\nBegleitet mit dem Dank für das außerordentliche Engagement aller beteiligten Arbeitskräfte wurde der Ofen Anfang März im Beisein der Geschäftsführer Winfried Müller und Dr. Christian W. Müller sowie dem Werksleiter Dr. Tilman Scholten, dem Leiter Produktion und Technik Marc Sesselmann sowie dem Abteilungsleiter für die Zement- und Kalkproduktion Klaus Neumann feierlich auf die 42. Ofenreise geschickt.\n„Mit dem Wiederanfahren der Produktion ist die Versorgung unserer Kunden in der Region mit unseren erstklassigen OTTERBEIN-Zementen rechtzeitig zum Beginn der Bausaison sichergestellt. Unsere Wertschöpfung vor Ort ermöglicht kurze Wege vom Hersteller zum Verbraucher, was die schnelle Verfügbarkeit unserer hochwertigen Produkte gewährleistet und durch die geringen Transportentfernungen das Klima und die Umwelt entlastet.\", betonte Geschäftsführer Dr. Christian W. Müller.\nEin Höhepunkt der diesjährigen Produktionspause war der Austausch des sog. Trommeltrockners, eines beeindruckenden 22 Meter langen und rund 80 Tonnen schweren massiven Stahlrohrs. Die aufwendige Maßnahme markiert den letzten Baustein des innovativen Großprojektes „OTTERBEIN ZEMENT ECO-PLUS 2023“, mit dem neue Maßstäbe bei der nachhaltigen und umweltschonenden Zementproduktion gesetzt werden. Der Trommeltrockner spielt eine entscheidende Rolle im energieeffizienten Trocknungsprozess von Kalkstein mittels Ofenabwärme und wird zukünftig auch für die Trocknung von Hüttensand genutzt. Dieser innovative Schritt ist ein weiterer Meilenstein auf dem Weg zur Reduzierung des CO2-Fußabdrucks in der Zementherstellung bei ZKW OTTERBEIN.\n\"Die erfolgreiche Zündung des Zementdrehofens und der Abschluss der Winterreparatur unterstreichen unser Engagement für Nachhaltigkeit und kontinuierliche Verbesserung. Durch den Abschluss des Großprojektes „OTTERBEIN ZEMENT ECO-PLUS 2023“ startet unsere Produktionslinie für Zement als eine der ressourcen- und emissionsärmsten weltweit in die neue Saison\", freut sich Werksleiter Dr. Tilman Scholten.\nWeitere Infos zu „OTTERBEIN ZEMENT ECO-PLUS 2023“ gibt es HIER.\nBildunterschrift: Den Zementdrehofen auf die 42. Ofenreise geschickt: Klaus Neumann, Dr. Tilman Scholten, Marc Sesselmann und Dr. Christian W. Müller (v.lks.).\n\n\n\n\n\n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n\n\n\n View the embedded image gallery online at:\n \n https://staging.zkw-otterbein.de/aktuelles-zum-nachbarschaftsdialog#sigFreeIddbf587df91\n\n\n\n\n\n' REGEXP REPLACE(REPLACE(tsynonyms, ', ', '|'), ',', '|') )
AND ( g.language LIKE 'de-DE' OR g.language = '*' )
ORDER BY ordering;
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | g | ALL | PRIMARY | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 2 | Using where; Using temporary; filesort wurde genutzt |
| 1 | SIMPLE | t | ALL | NULL | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 9 | Using where; Using join buffer (flat, BNL join) |
| Status | Duration |
|---|
| Starting | 0.02 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.14 ms |
| Checking permissions | 0.00 ms |
| Opening tables | 0.01 ms |
| After opening tables | 0.00 ms |
| System lock | 0.01 ms |
| Table lock | 0.00 ms |
| Waiting for query cache lock | 0.08 ms |
| Init | 0.06 ms |
| Optimizing | 0.02 ms |
| Statistics | 0.01 ms |
| Preparing | 0.02 ms |
| Creating tmp table | 0.02 ms |
| Sorting result | 0.01 ms |
| Executing | 0.00 ms |
| Sending data | 0.81 ms |
| Creating sort index | 0.02 ms |
| Removing tmp table | 0.02 ms |
| Creating sort index | 0.01 ms |
| End of update loop | 0.00 ms |
| Query end | 0.00 ms |
| Commit | 0.00 ms |
| Closing tables | 0.00 ms |
| Unlocking tables | 0.00 ms |
| Closing tables | 0.01 ms |
| Starting cleanup | 0.00 ms |
| Freeing items | 0.01 ms |
| Updating status | 0.00 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.00 ms |
| Storing result in query cache | 0.00 ms |
| Reset for next command | 0.00 ms |
| # | Aufrufer | Datei und Zeilennummer | | 15 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1689 |
| 14 | JDatabaseDriver->loadObjectList() | JROOT/plugins/content/seoglossary/seoglossary.php:263 |
| 13 | plgContentSeoglossary->onContentPrepare() | JROOT/libraries/joomla/event/event.php:69 |
| 12 | JEvent->update() | JROOT/libraries/joomla/event/dispatcher.php:159 |
| 11 | JEventDispatcher->trigger() | JROOT/components/com_content/views/category/view.html.php:106 |
| 10 | ContentViewCategory->display() | JROOT/libraries/legacy/controller/legacy.php:664 |
| 9 | JControllerLegacy->display() | JROOT/components/com_content/controller.php:113 |
| 8 | ContentController->display() | JROOT/libraries/legacy/controller/legacy.php:702 |
| 7 | JControllerLegacy->execute() | JROOT/components/com_content/content.php:38 |
| 6 | require_once JROOT/components/com_content/content.php | JROOT/libraries/cms/component/helper.php:405 |
| 5 | JComponentHelper::executeComponent() | JROOT/libraries/cms/component/helper.php:380 |
| 4 | JComponentHelper::renderComponent() | JROOT/libraries/cms/application/site.php:191 |
| 3 | JApplicationSite->dispatch() | JROOT/libraries/cms/application/site.php:230 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 1.01 ms Nach letzter Abfrage: 0.76 ms Abfragespeichernutzung: 0.028 MB Speichernutzung vor Abfrage: 7.651 MB Zeilen zurückgegeben: 0
SELECT t.*
FROM adqlu_seoglossary t
LEFT JOIN adqlu_seoglossaries g
ON t.catid = g.id
WHERE t.state = 1
AND g.state = 1
AND ( LOWER('Ehrungen und Verabschiedungen bei ZKW Otterbein\nWertschätzung für Teamgeist und Loyalität\nMüs, 01.02.2024. Mit einer – wie immer – sehr stimmungsvollen Feier wurden die Mitarbeiterinnen und Mitarbeiter für ihre langjährige Zugehörigkeit zu den ZKW Otterbein geehrt. Dass Zusammenhalt, Teamgeist und gemeinsames Engagement in diesem Unternehmen einen hohen Stellenwert besitzen, das zeigt sich bereits an der Vielzahl der Ehrungen für die langjährige Betriebszugehörigkeit. So wurden Jubilare für 10-, 20-, 25-, 30-, 35- und 40-jährige Zugehörigkeit ausgezeichnet. \nDoch nicht nur Teamgeist und Zusammenhalt prägen diese langjährige Zugehörigkeit, gleichzeitig, so betonte Geschäftsführender Gesellschafter Winfried Müller, seien diese Jubiläen mit einem hohen Wissensschatz verbunden, „wofür wir sehr dankbar sind“. Auch Geschäftsführer Dr. Christian Müller stellte das langjährige Engagement in den Fokus und betonte, dass die Geschäftsleitung dieses Engagement sehr hoch achte. Die Geschäftsleitung dankte ebenso den Familienangehörigen, deren steter Rückhalt einen entscheidenden Beitrag für den beruflichen Erfolg bedeuten. In persönlichen Ansprachen wurde das Engagement jedes Einzelnen gewürdigt und mit einem Geschenk bedacht.\nBeinahe als „Urgesteine“ des Unternehmens könnte man sie bezeichnen, die Mitarbeiter, die bereits seit 40 Jahren mit dabei sind: Dies sind Walter Hasenauer, Manfred Kömpel, Steffen Tschernich und Klaus Neumann. Gratulationen für ihre 35-jährige Betriebszugehörigkeit nahmen Anja Schnell, Jürgen Schöppner, Wolfgang Post, Oliver Czernek und Jörg Dörr entgegen. Drei Jahrzehnte gehören mittlerweile Viktor Fast, Ralf Kurätzki, Thadeus Hohmann und Steffen Stolz zum Otterbein-Team. Nicole Rößler wiederum ist seit 20 Jahren mit dabei. Seit zehn Jahren engagieren sich Jörg Henne, Sandor Botlo und Robert Mientus für die Zement- und Kalkwerke Otterbein. Über viele Jahre haben sie dem Unternehmen die Treue gehalten und wurden jetzt verabschiedet: Dies sind Andreas Hillenbrand, Rainer Jahn, Edgar Nierichlo und Miroslaw Jacyna.\n \n\n\n') LIKE CONCAT('%', LOWER(t.tterm), '%') OR 'Ehrungen und Verabschiedungen bei ZKW Otterbein\nWertschätzung für Teamgeist und Loyalität\nMüs, 01.02.2024. Mit einer – wie immer – sehr stimmungsvollen Feier wurden die Mitarbeiterinnen und Mitarbeiter für ihre langjährige Zugehörigkeit zu den ZKW Otterbein geehrt. Dass Zusammenhalt, Teamgeist und gemeinsames Engagement in diesem Unternehmen einen hohen Stellenwert besitzen, das zeigt sich bereits an der Vielzahl der Ehrungen für die langjährige Betriebszugehörigkeit. So wurden Jubilare für 10-, 20-, 25-, 30-, 35- und 40-jährige Zugehörigkeit ausgezeichnet. \nDoch nicht nur Teamgeist und Zusammenhalt prägen diese langjährige Zugehörigkeit, gleichzeitig, so betonte Geschäftsführender Gesellschafter Winfried Müller, seien diese Jubiläen mit einem hohen Wissensschatz verbunden, „wofür wir sehr dankbar sind“. Auch Geschäftsführer Dr. Christian Müller stellte das langjährige Engagement in den Fokus und betonte, dass die Geschäftsleitung dieses Engagement sehr hoch achte. Die Geschäftsleitung dankte ebenso den Familienangehörigen, deren steter Rückhalt einen entscheidenden Beitrag für den beruflichen Erfolg bedeuten. In persönlichen Ansprachen wurde das Engagement jedes Einzelnen gewürdigt und mit einem Geschenk bedacht.\nBeinahe als „Urgesteine“ des Unternehmens könnte man sie bezeichnen, die Mitarbeiter, die bereits seit 40 Jahren mit dabei sind: Dies sind Walter Hasenauer, Manfred Kömpel, Steffen Tschernich und Klaus Neumann. Gratulationen für ihre 35-jährige Betriebszugehörigkeit nahmen Anja Schnell, Jürgen Schöppner, Wolfgang Post, Oliver Czernek und Jörg Dörr entgegen. Drei Jahrzehnte gehören mittlerweile Viktor Fast, Ralf Kurätzki, Thadeus Hohmann und Steffen Stolz zum Otterbein-Team. Nicole Rößler wiederum ist seit 20 Jahren mit dabei. Seit zehn Jahren engagieren sich Jörg Henne, Sandor Botlo und Robert Mientus für die Zement- und Kalkwerke Otterbein. Über viele Jahre haben sie dem Unternehmen die Treue gehalten und wurden jetzt verabschiedet: Dies sind Andreas Hillenbrand, Rainer Jahn, Edgar Nierichlo und Miroslaw Jacyna.\n \n\n\n' REGEXP REPLACE(REPLACE(tsynonyms, ', ', '|'), ',', '|') )
AND ( g.language LIKE 'de-DE' OR g.language = '*' )
ORDER BY ordering;
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | g | ALL | PRIMARY | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 2 | Using where; Using temporary; filesort wurde genutzt |
| 1 | SIMPLE | t | ALL | NULL | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 9 | Using where; Using join buffer (flat, BNL join) |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.09 ms |
| Checking permissions | 0.00 ms |
| Opening tables | 0.01 ms |
| After opening tables | 0.00 ms |
| System lock | 0.00 ms |
| Table lock | 0.00 ms |
| Waiting for query cache lock | 0.02 ms |
| Init | 0.04 ms |
| Optimizing | 0.02 ms |
| Statistics | 0.01 ms |
| Preparing | 0.02 ms |
| Creating tmp table | 0.06 ms |
| Sorting result | 0.01 ms |
| Executing | 0.00 ms |
| Sending data | 0.55 ms |
| Creating sort index | 0.01 ms |
| Removing tmp table | 0.02 ms |
| Creating sort index | 0.01 ms |
| End of update loop | 0.00 ms |
| Query end | 0.00 ms |
| Commit | 0.00 ms |
| Closing tables | 0.00 ms |
| Unlocking tables | 0.00 ms |
| Closing tables | 0.01 ms |
| Starting cleanup | 0.00 ms |
| Freeing items | 0.01 ms |
| Updating status | 0.00 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.00 ms |
| Storing result in query cache | 0.01 ms |
| Reset for next command | 0.00 ms |
| # | Aufrufer | Datei und Zeilennummer | | 15 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1689 |
| 14 | JDatabaseDriver->loadObjectList() | JROOT/plugins/content/seoglossary/seoglossary.php:263 |
| 13 | plgContentSeoglossary->onContentPrepare() | JROOT/libraries/joomla/event/event.php:69 |
| 12 | JEvent->update() | JROOT/libraries/joomla/event/dispatcher.php:159 |
| 11 | JEventDispatcher->trigger() | JROOT/components/com_content/views/category/view.html.php:106 |
| 10 | ContentViewCategory->display() | JROOT/libraries/legacy/controller/legacy.php:664 |
| 9 | JControllerLegacy->display() | JROOT/components/com_content/controller.php:113 |
| 8 | ContentController->display() | JROOT/libraries/legacy/controller/legacy.php:702 |
| 7 | JControllerLegacy->execute() | JROOT/components/com_content/content.php:38 |
| 6 | require_once JROOT/components/com_content/content.php | JROOT/libraries/cms/component/helper.php:405 |
| 5 | JComponentHelper::executeComponent() | JROOT/libraries/cms/component/helper.php:380 |
| 4 | JComponentHelper::renderComponent() | JROOT/libraries/cms/application/site.php:191 |
| 3 | JApplicationSite->dispatch() | JROOT/libraries/cms/application/site.php:230 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 1.08 ms Nach letzter Abfrage: 1.50 ms Abfragespeichernutzung: 0.040 MB Speichernutzung vor Abfrage: 7.711 MB Zeilen zurückgegeben: 2
SELECT c.id, c.asset_id, c.access, c.alias, c.checked_out, c.checked_out_time,
c.created_time, c.created_user_id, c.description, c.extension, c.hits, c.language, c.level,
c.lft, c.metadata, c.metadesc, c.metakey, c.modified_time, c.note, c.params, c.parent_id,
c.path, c.published, c.rgt, c.title, c.modified_user_id, c.version,
CASE WHEN CHAR_LENGTH(c.alias) != 0 THEN CONCAT_WS(':', c.id, c.alias) ELSE c.id END as slug
FROM adqlu_categories as c
LEFT JOIN (SELECT cat.id as id
FROM adqlu_categories AS cat JOIN adqlu_categories AS parent
ON cat.lft BETWEEN parent.lft
AND parent.rgt
WHERE parent.extension = 'com_content'
AND parent.published != 1
GROUP BY cat.id) AS badcats
ON badcats.id = c.id
LEFT JOIN adqlu_categories AS s
ON (s.lft <= c.lft
AND s.rgt >= c.rgt) OR (s.lft > c.lft
AND s.rgt < c.rgt)
WHERE (c.extension='com_content' OR c.extension='system')
AND c.access IN (1,1)
AND c.published = 1
AND badcats.id is null
AND s.id=38
GROUP BY c.id, c.asset_id, c.access, c.alias, c.checked_out, c.checked_out_time,
c.created_time, c.created_user_id, c.description, c.extension, c.hits, c.language, c.level,
c.lft, c.metadata, c.metadesc, c.metakey, c.modified_time, c.note, c.params, c.parent_id,
c.path, c.published, c.rgt, c.title, c.modified_user_id, c.version
ORDER BY c.lft
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | PRIMARY | s | const | PRIMARY,idx_left_right | PRIMARY | 4 | const | 1 | Using temporary; filesort wurde genutzt |
| 1 | PRIMARY | c | ALL | cat_idx,idx_access,idx_left_right | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 38 | Using where |
| 1 | PRIMARY | <derived2> | ref | key0 | key0 | 5 | staging_otterbein.c.id | 10 | Using where |
| 2 | DERIVED | parent | ref | cat_idx,idx_left_right | cat_idx | 202 | const | 9 | Using index condition; Using temporary; filesort wurde genutzt |
| 2 | DERIVED | cat | index | PRIMARY,idx_left_right | idx_left_right | 8 | NULL | 38 | Using where; Using index; Using join buffer (flat, BNL join) |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.10 ms |
| Checking permissions | 0.00 ms |
| Opening tables | 0.02 ms |
| After opening tables | 0.01 ms |
| System lock | 0.00 ms |
| Table lock | 0.00 ms |
| Waiting for query cache lock | 0.02 ms |
| Init | 0.06 ms |
| Optimizing | 0.02 ms |
| Optimizing | 0.01 ms |
| Statistics | 0.04 ms |
| Statistics | 0.06 ms |
| Preparing | 0.01 ms |
| Creating tmp table | 0.01 ms |
| Sorting result | 0.01 ms |
| Preparing | 0.00 ms |
| Unlocking tables | 0.00 ms |
| Preparing | 0.02 ms |
| Creating tmp table | 0.03 ms |
| Sorting result | 0.01 ms |
| Executing | 0.00 ms |
| Sending data | 0.03 ms |
| Executing | 0.00 ms |
| Sending data | 0.10 ms |
| Creating sort index | 0.01 ms |
| Removing tmp table | 0.01 ms |
| Creating sort index | 0.27 ms |
| Creating sort index | 0.03 ms |
| Removing tmp table | 0.04 ms |
| Creating sort index | 0.01 ms |
| End of update loop | 0.01 ms |
| Query end | 0.00 ms |
| Commit | 0.00 ms |
| Closing tables | 0.00 ms |
| Removing tmp table | 0.00 ms |
| Closing tables | 0.00 ms |
| Unlocking tables | 0.00 ms |
| Closing tables | 0.01 ms |
| Starting cleanup | 0.00 ms |
| Freeing items | 0.01 ms |
| Updating status | 0.00 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.01 ms |
| Waiting for query cache lock | 0.01 ms |
| Updating status | 0.00 ms |
| Storing result in query cache | 0.01 ms |
| Reset for next command | 0.01 ms |
| # | Aufrufer | Datei und Zeilennummer | | 21 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1689 |
| 20 | JDatabaseDriver->loadObjectList() | JROOT/libraries/legacy/categories/categories.php:309 |
| 19 | JCategories->_load() | JROOT/libraries/legacy/categories/categories.php:184 |
| 18 | JCategories->get() | JROOT/components/com_content/helpers/route.php:44 |
| 17 | ContentHelperRoute::getArticleRoute() | JROOT/templates/kallyas/html/com_content/category/blog_item.php:32 |
| 16 | include JROOT/templates/kallyas/html/com_content/category/blog_item.php | JROOT/libraries/legacy/view/legacy.php:677 |
| 15 | JViewLegacy->loadTemplate() | JROOT/templates/kallyas/html/com_content/category/blog.php:172 |
| 14 | include JROOT/templates/kallyas/html/com_content/category/blog.php | JROOT/libraries/legacy/view/legacy.php:677 |
| 13 | JViewLegacy->loadTemplate() | JROOT/libraries/legacy/view/legacy.php:216 |
| 12 | JViewLegacy->display() | JROOT/libraries/legacy/view/category.php:233 |
| 11 | JViewCategory->display() | JROOT/components/com_content/views/category/view.html.php:258 |
| 10 | ContentViewCategory->display() | JROOT/libraries/legacy/controller/legacy.php:664 |
| 9 | JControllerLegacy->display() | JROOT/components/com_content/controller.php:113 |
| 8 | ContentController->display() | JROOT/libraries/legacy/controller/legacy.php:702 |
| 7 | JControllerLegacy->execute() | JROOT/components/com_content/content.php:38 |
| 6 | require_once JROOT/components/com_content/content.php | JROOT/libraries/cms/component/helper.php:405 |
| 5 | JComponentHelper::executeComponent() | JROOT/libraries/cms/component/helper.php:380 |
| 4 | JComponentHelper::renderComponent() | JROOT/libraries/cms/application/site.php:191 |
| 3 | JApplicationSite->dispatch() | JROOT/libraries/cms/application/site.php:230 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 0.56 ms Nach letzter Abfrage: 2.70 ms Abfragespeichernutzung: 0.024 MB Speichernutzung vor Abfrage: 8.072 MB Zeilen zurückgegeben: 0
SELECT m.id, m.title, m.module, m.position, m.content, m.showtitle, m.params, mm.menuid
FROM adqlu_modules AS m
LEFT JOIN adqlu_modules_menu AS mm
ON mm.moduleid = m.id
LEFT JOIN adqlu_extensions AS e
ON e.element = m.module
AND e.client_id = m.client_id
WHERE m.published = 1
AND module = 'mod_maximenuck'
AND e.enabled = 1
AND (m.publish_up = '0000-00-00 00:00:00' OR m.publish_up <= '2026-09-04 05:38:39')
AND (m.publish_down = '0000-00-00 00:00:00' OR m.publish_down >= '2026-09-04 05:38:39')
AND m.access IN (1,1)
AND m.client_id = 0
AND (mm.menuid = 687 OR mm.menuid <= 0)
ORDER BY m.position, m.ordering
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | m | ref | PRIMARY,published,newsfeeds | newsfeeds | 204 | const,const | 1 | Using index condition; Using where; filesort wurde genutzt |
| 1 | SIMPLE | e | ref | element_clientid,element_folder_clientid | element_clientid | 403 | staging_otterbein.m.module,const | 1 | Using index condition; Using where |
| 1 | SIMPLE | mm | ref | PRIMARY | PRIMARY | 4 | staging_otterbein.m.id | 3 | Using where; Using index |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.01 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.08 ms |
| Checking permissions | 0.01 ms |
| Opening tables | 0.02 ms |
| After opening tables | 0.01 ms |
| System lock | 0.00 ms |
| Table lock | 0.00 ms |
| Waiting for query cache lock | 0.01 ms |
| Init | 0.03 ms |
| Optimizing | 0.04 ms |
| Statistics | 0.08 ms |
| Preparing | 0.05 ms |
| Sorting result | 0.01 ms |
| Executing | 0.01 ms |
| Sending data | 0.01 ms |
| Creating sort index | 0.04 ms |
| End of update loop | 0.01 ms |
| Query end | 0.00 ms |
| Commit | 0.01 ms |
| Closing tables | 0.00 ms |
| Unlocking tables | 0.00 ms |
| Closing tables | 0.01 ms |
| Starting cleanup | 0.00 ms |
| Freeing items | 0.01 ms |
| Updating status | 0.01 ms |
| Waiting for query cache lock | 0.01 ms |
| Updating status | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.00 ms |
| Storing result in query cache | 0.02 ms |
| Reset for next command | 0.01 ms |
| # | Aufrufer | Datei und Zeilennummer | | 10 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1689 |
| 9 | JDatabaseDriver->loadObjectList() | JROOT/plugins/system/maximenuckmobile/maximenuckmobile.php:248 |
| 8 | plgSystemMaximenuckmobile->getMaximenuModules() | JROOT/plugins/system/maximenuckmobile/maximenuckmobile.php:105 |
| 7 | plgSystemMaximenuckmobile->onAfterDispatch() | JROOT/libraries/joomla/event/event.php:69 |
| 6 | JEvent->update() | JROOT/libraries/joomla/event/dispatcher.php:159 |
| 5 | JEventDispatcher->trigger() | JROOT/libraries/joomla/application/base.php:106 |
| 4 | JApplicationBase->triggerEvent() | JROOT/libraries/cms/application/site.php:196 |
| 3 | JApplicationSite->dispatch() | JROOT/libraries/cms/application/site.php:230 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 0.08 ms Nach letzter Abfrage: 0.04 ms Abfragespeichernutzung: 0.022 MB Speichernutzung vor Abfrage: 8.074 MB Zeilen zurückgegeben: 0
SELECT id,placeholder
FROM `adqlu_gdpr_checkbox`
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | adqlu_gdpr_checkbox | ALL | NULL | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 1 | |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.00 ms |
| Checking privileges on cached | 0.00 ms |
| Checking permissions | 0.01 ms |
| Sending cached result to clien | 0.01 ms |
| Updating status | 0.01 ms |
| Reset for next command | 0.00 ms |
| # | Aufrufer | Datei und Zeilennummer | | 9 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1689 |
| 8 | JDatabaseDriver->loadObjectList() | JROOT/plugins/system/gdpr/gdpr.php:1291 |
| 7 | plgSystemGdpr->onAfterDispatch() | JROOT/libraries/joomla/event/event.php:69 |
| 6 | JEvent->update() | JROOT/libraries/joomla/event/dispatcher.php:159 |
| 5 | JEventDispatcher->trigger() | JROOT/libraries/joomla/application/base.php:106 |
| 4 | JApplicationBase->triggerEvent() | JROOT/libraries/cms/application/site.php:196 |
| 3 | JApplicationSite->dispatch() | JROOT/libraries/cms/application/site.php:230 |
| 2 | JApplicationSite->doExecute() | JROOT/libraries/cms/application/cms.php:261 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 7.76 ms Nach letzter Abfrage: 1.87 ms Abfragespeichernutzung: 0.027 MB Speichernutzung vor Abfrage: 8.188 MB Zeilen zurückgegeben: 9
SELECT m.id, m.title, m.module, m.position, m.content, m.showtitle, m.params, mm.menuid
FROM adqlu_modules AS m
LEFT JOIN adqlu_modules_menu AS mm
ON mm.moduleid = m.id
LEFT JOIN adqlu_extensions AS e
ON e.element = m.module
AND e.client_id = m.client_id
WHERE m.published = 1
AND e.enabled = 1
AND (m.publish_up = '0000-00-00 00:00:00' OR m.publish_up <= '2026-09-04 05:38:39')
AND (m.publish_down = '0000-00-00 00:00:00' OR m.publish_down >= '2026-09-04 05:38:39')
AND m.access IN (1,1)
AND m.client_id = 0
AND (mm.menuid = 687 OR mm.menuid <= 0)
ORDER BY m.position, m.ordering
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | m | ref | PRIMARY,published,newsfeeds | published | 1 | const | 403 | Using index condition; Using where; filesort wurde genutzt |
| 1 | SIMPLE | e | ref | element_clientid,element_folder_clientid | element_clientid | 403 | staging_otterbein.m.module,const | 1 | Using index condition; Using where |
| 1 | SIMPLE | mm | ref | PRIMARY | PRIMARY | 4 | staging_otterbein.m.id | 3 | Using where; Using index |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.06 ms |
| Checking permissions | 0.01 ms |
| Opening tables | 0.02 ms |
| After opening tables | 0.00 ms |
| System lock | 0.00 ms |
| Table lock | 0.00 ms |
| Waiting for query cache lock | 0.01 ms |
| Init | 0.03 ms |
| Optimizing | 0.04 ms |
| Statistics | 0.04 ms |
| Preparing | 0.04 ms |
| Sorting result | 0.01 ms |
| Executing | 0.00 ms |
| Sending data | 0.01 ms |
| Creating sort index | 7.32 ms |
| End of update loop | 0.01 ms |
| Query end | 0.00 ms |
| Commit | 0.01 ms |
| Closing tables | 0.00 ms |
| Unlocking tables | 0.00 ms |
| Closing tables | 0.01 ms |
| Starting cleanup | 0.00 ms |
| Freeing items | 0.01 ms |
| Updating status | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.02 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.00 ms |
| Storing result in query cache | 0.01 ms |
| Reset for next command | 0.01 ms |
| # | Aufrufer | Datei und Zeilennummer | | 14 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1689 |
| 13 | JDatabaseDriver->loadObjectList() | JROOT/libraries/joomla/cache/controller/callback.php:152 |
| 12 | JCacheControllerCallback->get() | JROOT/libraries/cms/module/helper.php:425 |
| 11 | JModuleHelper::getModuleList() | JROOT/libraries/cms/module/helper.php:361 |
| 10 | JModuleHelper::load() | JROOT/libraries/cms/module/helper.php:84 |
| 9 | JModuleHelper::getModules() | JROOT/libraries/joomla/document/html.php:514 |
| 8 | JDocumentHtml->countModules() | JROOT/templates/kallyas/index.php:18 |
| 7 | require JROOT/templates/kallyas/index.php | JROOT/libraries/joomla/document/html.php:578 |
| 6 | JDocumentHtml->_loadTemplate() | JROOT/libraries/joomla/document/html.php:640 |
| 5 | JDocumentHtml->_fetchTemplate() | JROOT/libraries/joomla/document/html.php:455 |
| 4 | JDocumentHtml->parse() | JROOT/libraries/cms/application/cms.php:1072 |
| 3 | JApplicationCms->render() | JROOT/libraries/cms/application/site.php:773 |
| 2 | JApplicationSite->render() | JROOT/libraries/cms/application/cms.php:267 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 0.12 ms Nach letzter Abfrage: 18.79 ms Abfragespeichernutzung: 0.030 MB Speichernutzung vor Abfrage: 8.427 MB Zeilen zurückgegeben: 0
SELECT t.*
FROM adqlu_seoglossary t
LEFT JOIN adqlu_seoglossaries g
ON t.catid = g.id
WHERE t.state = 1
AND g.state = 1
AND ( LOWER('{myshariff}\n') LIKE CONCAT('%', LOWER(t.tterm), '%') OR '{myshariff}\n' REGEXP REPLACE(REPLACE(tsynonyms, ', ', '|'), ',', '|') )
AND ( g.language LIKE 'de-DE' OR g.language = '*' )
ORDER BY ordering;
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | g | ALL | PRIMARY | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 2 | Using where; Using temporary; filesort wurde genutzt |
| 1 | SIMPLE | t | ALL | NULL | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 9 | Using where; Using join buffer (flat, BNL join) |
| Status | Duration |
|---|
| Starting | 0.02 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.01 ms |
| Checking privileges on cached | 0.00 ms |
| Checking permissions | 0.01 ms |
| Sending cached result to clien | 0.01 ms |
| Updating status | 0.00 ms |
| Reset for next command | 0.00 ms |
| # | Aufrufer | Datei und Zeilennummer | | 18 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1689 |
| 17 | JDatabaseDriver->loadObjectList() | JROOT/plugins/content/seoglossary/seoglossary.php:263 |
| 16 | plgContentSeoglossary->onContentPrepare() | JROOT/libraries/joomla/event/event.php:69 |
| 15 | JEvent->update() | JROOT/libraries/joomla/event/dispatcher.php:159 |
| 14 | JEventDispatcher->trigger() | JROOT/libraries/cms/html/content.php:41 |
| 13 | JHtmlContent::prepare() | JROOT/libraries/cms/html/html.php:237 |
| 12 | JHtml::call() | JROOT/libraries/cms/html/html.php:139 |
| 11 | JHtml::_() | JROOT/modules/mod_custom/mod_custom.php:15 |
| 10 | include JROOT/modules/mod_custom/mod_custom.php | JROOT/libraries/cms/module/helper.php:199 |
| 9 | JModuleHelper::renderModule() | JROOT/libraries/joomla/document/renderer/html/module.php:93 |
| 8 | JDocumentRendererHtmlModule->render() | JROOT/libraries/joomla/document/renderer/html/modules.php:42 |
| 7 | JDocumentRendererHtmlModules->render() | JROOT/libraries/joomla/document/html.php:411 |
| 6 | JDocumentHtml->getBuffer() | JROOT/libraries/joomla/document/html.php:702 |
| 5 | JDocumentHtml->_renderTemplate() | JROOT/libraries/joomla/document/html.php:477 |
| 4 | JDocumentHtml->render() | JROOT/libraries/cms/application/cms.php:1086 |
| 3 | JApplicationCms->render() | JROOT/libraries/cms/application/site.php:773 |
| 2 | JApplicationSite->render() | JROOT/libraries/cms/application/cms.php:267 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 0.10 ms Nach letzter Abfrage: 1.96 ms Abfragespeichernutzung: 0.035 MB Speichernutzung vor Abfrage: 8.490 MB Zeilen zurückgegeben: 0
SELECT *
FROM `adqlu_modules`
WHERE `id`='121'
AND `published`='1'
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | NULL | NULL | NULL | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | NULL | Impossible WHERE noticed after reading const tables |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.01 ms |
| Checking privileges on cached | 0.00 ms |
| Checking permissions | 0.01 ms |
| Sending cached result to clien | 0.01 ms |
| Updating status | 0.00 ms |
| Reset for next command | 0.00 ms |
| # | Aufrufer | Datei und Zeilennummer | | 30 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1689 |
| 29 | JDatabaseDriver->loadObjectList() | JROOT/plugins/system/hg_assets/shortcodes/shortcodes.php:60 |
| 28 | hg_module() | JROOT/libraries/zauan/shortcodes/shortcodes.php:98 |
| 27 | do_shortcode_tag() | Der selbe Aufruf in der Zeile darunter. |
| 26 | preg_replace_callback() | JROOT/libraries/zauan/shortcodes/shortcodes.php:44 |
| 25 | do_shortcode() | JROOT/plugins/system/hg_assets/shortcodes/shortcodes_grid.php:34 |
| 24 | hg_grid() | JROOT/libraries/zauan/shortcodes/shortcodes.php:98 |
| 23 | do_shortcode_tag() | Der selbe Aufruf in der Zeile darunter. |
| 22 | preg_replace_callback() | JROOT/libraries/zauan/shortcodes/shortcodes.php:44 |
| 21 | do_shortcode() | JROOT/plugins/system/hg_assets/shortcodes/shortcodes_grid.php:421 |
| 20 | hg_row() | JROOT/libraries/zauan/shortcodes/shortcodes.php:98 |
| 19 | do_shortcode_tag() | Der selbe Aufruf in der Zeile darunter. |
| 18 | preg_replace_callback() | JROOT/libraries/zauan/shortcodes/shortcodes.php:44 |
| 17 | do_shortcode() | JROOT/plugins/system/hg_assets/hg_assets.php:136 |
| 16 | plgSystemHG_Assets->onContentPrepare() | JROOT/libraries/joomla/event/event.php:69 |
| 15 | JEvent->update() | JROOT/libraries/joomla/event/dispatcher.php:159 |
| 14 | JEventDispatcher->trigger() | JROOT/libraries/cms/html/content.php:41 |
| 13 | JHtmlContent::prepare() | JROOT/libraries/cms/html/html.php:237 |
| 12 | JHtml::call() | JROOT/libraries/cms/html/html.php:105 |
| 11 | JHtml::_() | JROOT/modules/mod_custom/mod_custom.php:15 |
| 10 | include JROOT/modules/mod_custom/mod_custom.php | JROOT/libraries/cms/module/helper.php:199 |
| 9 | JModuleHelper::renderModule() | JROOT/libraries/joomla/document/renderer/html/module.php:93 |
| 8 | JDocumentRendererHtmlModule->render() | JROOT/libraries/joomla/document/renderer/html/modules.php:42 |
| 7 | JDocumentRendererHtmlModules->render() | JROOT/libraries/joomla/document/html.php:411 |
| 6 | JDocumentHtml->getBuffer() | JROOT/libraries/joomla/document/html.php:702 |
| 5 | JDocumentHtml->_renderTemplate() | JROOT/libraries/joomla/document/html.php:477 |
| 4 | JDocumentHtml->render() | JROOT/libraries/cms/application/cms.php:1086 |
| 3 | JApplicationCms->render() | JROOT/libraries/cms/application/site.php:773 |
| 2 | JApplicationSite->render() | JROOT/libraries/cms/application/cms.php:267 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 0.09 ms Nach letzter Abfrage: 0.28 ms Abfragespeichernutzung: 0.030 MB Speichernutzung vor Abfrage: 8.491 MB Zeilen zurückgegeben: 0
SELECT t.*
FROM adqlu_seoglossary t
LEFT JOIN adqlu_seoglossaries g
ON t.catid = g.id
WHERE t.state = 1
AND g.state = 1
AND ( LOWER(' \nZEMENT- UND KALKWERKE OTTERBEIN GMBH & CO. KG\nHauptstraße 50\n36137 Großenlüder-Müs (Germany)\nTel.: +49 6648 68 - 0\nFax.: +49 6648 68 - 400\ninfo@zkw-otterbein.de\n\n\n\n\nyoutube\nfacebook\n\n\n\n') LIKE CONCAT('%', LOWER(t.tterm), '%') OR ' \nZEMENT- UND KALKWERKE OTTERBEIN GMBH & CO. KG\nHauptstraße 50\n36137 Großenlüder-Müs (Germany)\nTel.: +49 6648 68 - 0\nFax.: +49 6648 68 - 400\ninfo@zkw-otterbein.de\n\n\n\n\nyoutube\nfacebook\n\n\n\n' REGEXP REPLACE(REPLACE(tsynonyms, ', ', '|'), ',', '|') )
AND ( g.language LIKE 'de-DE' OR g.language = '*' )
ORDER BY ordering;
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | g | ALL | PRIMARY | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 2 | Using where; Using temporary; filesort wurde genutzt |
| 1 | SIMPLE | t | ALL | NULL | ES KONNTE KEIN INDEX-SCHLÜSSEL GENUTZT WERDEN | NULL | NULL | 9 | Using where; Using join buffer (flat, BNL join) |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.01 ms |
| Checking privileges on cached | 0.01 ms |
| Checking permissions | 0.01 ms |
| Sending cached result to clien | 0.01 ms |
| Updating status | 0.00 ms |
| Reset for next command | 0.00 ms |
| # | Aufrufer | Datei und Zeilennummer | | 18 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1689 |
| 17 | JDatabaseDriver->loadObjectList() | JROOT/plugins/content/seoglossary/seoglossary.php:263 |
| 16 | plgContentSeoglossary->onContentPrepare() | JROOT/libraries/joomla/event/event.php:69 |
| 15 | JEvent->update() | JROOT/libraries/joomla/event/dispatcher.php:159 |
| 14 | JEventDispatcher->trigger() | JROOT/libraries/cms/html/content.php:41 |
| 13 | JHtmlContent::prepare() | JROOT/libraries/cms/html/html.php:237 |
| 12 | JHtml::call() | JROOT/libraries/cms/html/html.php:105 |
| 11 | JHtml::_() | JROOT/modules/mod_custom/mod_custom.php:15 |
| 10 | include JROOT/modules/mod_custom/mod_custom.php | JROOT/libraries/cms/module/helper.php:199 |
| 9 | JModuleHelper::renderModule() | JROOT/libraries/joomla/document/renderer/html/module.php:93 |
| 8 | JDocumentRendererHtmlModule->render() | JROOT/libraries/joomla/document/renderer/html/modules.php:42 |
| 7 | JDocumentRendererHtmlModules->render() | JROOT/libraries/joomla/document/html.php:411 |
| 6 | JDocumentHtml->getBuffer() | JROOT/libraries/joomla/document/html.php:702 |
| 5 | JDocumentHtml->_renderTemplate() | JROOT/libraries/joomla/document/html.php:477 |
| 4 | JDocumentHtml->render() | JROOT/libraries/cms/application/cms.php:1086 |
| 3 | JApplicationCms->render() | JROOT/libraries/cms/application/site.php:773 |
| 2 | JApplicationSite->render() | JROOT/libraries/cms/application/cms.php:267 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
Abfragezeit: 0.37 ms Nach letzter Abfrage: 1.13 ms Abfragespeichernutzung: 0.026 MB Speichernutzung vor Abfrage: 8.521 MB Zeilen zurückgegeben: 0
SELECT *
FROM adqlu_jmap_metainfo
WHERE `linkurl` = 'https://staging.zkw-otterbein.de/aktuelles-zum-nachbarschaftsdialog'
AND `published` = 1
| id | select_type | table | type | possible_keys | key | key_len | ref | rows | Extra |
|---|
| 1 | SIMPLE | adqlu_jmap_metainfo | ref | linkurl,published | linkurl | 767 | const | 1 | Using where |
| Status | Duration |
|---|
| Starting | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Init | 0.00 ms |
| Checking query cache for query | 0.03 ms |
| Checking permissions | 0.01 ms |
| Opening tables | 0.02 ms |
| After opening tables | 0.01 ms |
| System lock | 0.01 ms |
| Table lock | 0.01 ms |
| Waiting for query cache lock | 0.01 ms |
| Init | 0.03 ms |
| Optimizing | 0.02 ms |
| Statistics | 0.04 ms |
| Preparing | 0.02 ms |
| Executing | 0.01 ms |
| Sending data | 0.03 ms |
| End of update loop | 0.01 ms |
| Query end | 0.00 ms |
| Commit | 0.01 ms |
| Closing tables | 0.01 ms |
| Unlocking tables | 0.00 ms |
| Closing tables | 0.03 ms |
| Starting cleanup | 0.00 ms |
| Freeing items | 0.01 ms |
| Updating status | 0.01 ms |
| Waiting for query cache lock | 0.00 ms |
| Updating status | 0.03 ms |
| Waiting for query cache lock | 0.01 ms |
| Updating status | 0.00 ms |
| Storing result in query cache | 0.01 ms |
| Reset for next command | 0.01 ms |
| # | Aufrufer | Datei und Zeilennummer | | 14 | JDatabaseDriverMysqli->execute() | JROOT/libraries/joomla/database/driver.php:1650 |
| 13 | JDatabaseDriver->loadObject() | JROOT/plugins/system/jmap/jmap.php:276 |
| 12 | plgSystemJMap->onBeforeCompileHead() | JROOT/libraries/joomla/event/event.php:69 |
| 11 | JEvent->update() | JROOT/libraries/joomla/event/dispatcher.php:159 |
| 10 | JEventDispatcher->trigger() | JROOT/libraries/joomla/application/base.php:106 |
| 9 | JApplicationBase->triggerEvent() | JROOT/libraries/joomla/document/renderer/html/head.php:58 |
| 8 | JDocumentRendererHtmlHead->fetchHead() | JROOT/libraries/joomla/document/renderer/html/head.php:34 |
| 7 | JDocumentRendererHtmlHead->render() | JROOT/libraries/joomla/document/html.php:411 |
| 6 | JDocumentHtml->getBuffer() | JROOT/libraries/joomla/document/html.php:702 |
| 5 | JDocumentHtml->_renderTemplate() | JROOT/libraries/joomla/document/html.php:477 |
| 4 | JDocumentHtml->render() | JROOT/libraries/cms/application/cms.php:1086 |
| 3 | JApplicationCms->render() | JROOT/libraries/cms/application/site.php:773 |
| 2 | JApplicationSite->render() | JROOT/libraries/cms/application/cms.php:267 |
| 1 | JApplicationCms->execute() | JROOT/index.php:49 |
11 × SELECT t.*
FROM adqlu_seoglossary t
LEFT JOIN adqlu_seoglossaries g
ON t.catid = g.id
2 × SELECT `extension_id` AS `id`,`element` AS `option`,`params`,`enabled`
FROM `adqlu_extensions`
2 × SELECT m.id, m.title, m.module, m.position, m.content, m.showtitle, m.params, mm.menuid
FROM adqlu_modules AS m
LEFT JOIN adqlu_modules_menu AS mm
ON mm.moduleid = m.id
LEFT JOIN adqlu_extensions AS e
ON e.element = m.module
AND e.client_id = m.client_id
1 × SELECT `data`
FROM `adqlu_session`
1 × SELECT *
FROM `adqlu_modules`
1 × SELECT id,placeholder
FROM `adqlu_gdpr_checkbox
1 × SELECT c.id, c.asset_id, c.access, c.alias, c.checked_out, c.checked_out_time, c.created_time, c.created_user_id, c.description, c.extension, c.hits, c.language, c.level, c.lft, c.metadata, c.metadesc, c.metakey, c.modified_time, c.note, c.params, c.parent_id, c.path, c.published, c.rgt, c.title, c.modified_user_id, c.version,
CASE WHEN CHAR_LENGTH(c.alias) != 0 THEN CONCAT_WS(':', c.id, c.alias) ELSE c.id END as slug
FROM adqlu_categories as c
LEFT JOIN (SELECT cat.id as id
FROM adqlu_categories AS cat JOIN adqlu_categories AS parent
ON cat.lft BETWEEN parent.lft
AND parent.rgt
1 × SELECT `m`.`tag_id`,`t`.*
FROM `adqlu_contentitem_tag_map` AS m
INNER JOIN `adqlu_tags` AS t
ON `m`.`tag_id` = `t`.`id`
1 × SELECT COUNT(*)
FROM adqlu_content AS a
LEFT JOIN adqlu_categories AS c
ON c.id = a.catid
LEFT JOIN adqlu_users AS ua
ON ua.id = a.created_by
LEFT JOIN adqlu_users AS uam
ON uam.id = a.modified_by
LEFT JOIN adqlu_categories as parent
ON parent.id = c.parent_id
LEFT JOIN adqlu_content_rating AS v
ON a.id = v.content_id
LEFT
OUTER JOIN (SELECT cat.id as id
FROM adqlu_categories AS cat JOIN adqlu_categories AS parent
ON cat.lft BETWEEN parent.lft
AND parent.rgt
1 × SELECT a.id, a.title, a.alias, a.introtext, a.fulltext, a.checked_out, a.checked_out_time, a.catid, a.created, a.created_by, a.created_by_alias,
CASE WHEN a.modified = '0000-00-00 00:00:00' THEN a.created ELSE a.modified END as modified, a.modified_by, uam.name as modified_by_name,
CASE WHEN a.publish_up = '0000-00-00 00:00:00' THEN a.created ELSE a.publish_up END as publish_up,a.publish_down, a.images, a.urls, a.attribs, a.metadata, a.metakey, a.metadesc, a.access, a.hits, a.xreference, a.featured, a.language, LENGTH(a.fulltext) AS readmore,
CASE WHEN badcats.id is not null THEN 0 ELSE a.state END AS state,c.title AS category_title, c.path AS category_route, c.access AS category_access, c.alias AS category_alias,
CASE WHEN a.created_by_alias > ' ' THEN a.created_by_alias ELSE ua.name END AS author,ua.email AS author_email,parent.title as parent_title, parent.id as parent_id, parent.path as parent_route, parent.alias as parent_alias,ROUND(v.rating_sum / v.rating_count, 0) AS rating, v.rating_count as rating_count,c.published,
CASE WHEN badcats.id is null THEN c.published ELSE 0 END AS parents_published
FROM adqlu_content AS a
LEFT JOIN adqlu_categories AS c
ON c.id = a.catid
LEFT JOIN adqlu_users AS ua
ON ua.id = a.created_by
LEFT JOIN adqlu_users AS uam
ON uam.id = a.modified_by
LEFT JOIN adqlu_categories as parent
ON parent.id = c.parent_id
LEFT JOIN adqlu_content_rating AS v
ON a.id = v.content_id
LEFT
OUTER JOIN (SELECT cat.id as id
FROM adqlu_categories AS cat JOIN adqlu_categories AS parent
ON cat.lft BETWEEN parent.lft
AND parent.rgt
1 × SELECT a.name, a.rules
FROM adqlu_assets AS a
1 × SELECT element
FROM adqlu_extensions
1 × SELECT c.id, c.asset_id, c.access, c.alias, c.checked_out, c.checked_out_time, c.created_time, c.created_user_id, c.description, c.extension, c.hits, c.language, c.level, c.lft, c.metadata, c.metadesc, c.metakey, c.modified_time, c.note, c.params, c.parent_id, c.path, c.published, c.rgt, c.title, c.modified_user_id, c.version,
CASE WHEN CHAR_LENGTH(c.alias) != 0 THEN CONCAT_WS(':', c.id, c.alias) ELSE c.id END as slug,COUNT(i.`id`) AS numitems
FROM adqlu_categories as c
LEFT JOIN (SELECT cat.id as id
FROM adqlu_categories AS cat JOIN adqlu_categories AS parent
ON cat.lft BETWEEN parent.lft
AND parent.rgt
1 × SELECT a.id, a.name, a.rules
FROM adqlu_assets AS a
1 × SELECT a.id, a.parent_id
FROM adqlu_assets AS a
1 × SELECT a.rules
FROM adqlu_assets AS a
1 × SELECT *
FROM adqlu_assets
1 × SELECT *
FROM adqlu_languages
1 × SELECT id, home, template, s.params
FROM adqlu_template_styles as s
LEFT JOIN adqlu_extensions as e
ON e.element=s.template
AND e.type='template'
AND e.client_id=s.client_id
1 × SELECT m.id, m.menutype, m.title, m.alias, m.note, m.path AS route, m.link, m.type, m.level, m.language,`m`.`browserNav`, m.access, m.params, m.home, m.img, m.template_style_id, m.component_id, m.parent_id,e.element as component
FROM adqlu_menu AS m
LEFT JOIN adqlu_extensions AS e
ON m.component_id = e.extension_id
1 × SELECT folder AS type, element AS name, params
FROM adqlu_extensions
1 × SELECT id, rules
FROM `adqlu_viewlevels
1 × SELECT b.id
FROM adqlu_usergroups AS a
LEFT JOIN adqlu_usergroups AS b
ON b.lft <= a.lft
AND b.rgt >= a.rgt
1 × SELECT *
FROM adqlu_jmap_metainfo